Development, buildings and fabric<br />

Fabric report (a)<br />

Once every five years all the CofE churches<br />

in England are required under church law<br />

to have a quinquennial inspection of their<br />

building.<br />

In <strong>2022</strong>, the inspection is due for <strong>St</strong> <strong>Mary</strong><br />

<strong>Redcliffe</strong> and to do this, I have to spend a<br />

number of days inspecting all aspects of<br />

the building. The survey starts with roofs,<br />

rainw<strong>at</strong>er goods and walls, considers each<br />

of the windows, the churchyard and the<br />

entire interior of the church including all<br />

the roof spaces.<br />

The conclusion of the inspection is a report<br />

with recommend<strong>at</strong>ions for repairs. High<br />

priority works need to be undertaken within<br />

the next twelve months and lower priority<br />

works need to be scheduled for some<br />

point in the next 5 years. The high priority<br />

works generally rel<strong>at</strong>e to Health and Safety<br />

m<strong>at</strong>ters. In addition, a longer-term plan is<br />

also being developed to consider the next<br />

20-year period and the associ<strong>at</strong>ed potential<br />

costs. In addition to the report itself, there<br />

is also a requirement to carry out a fiveyearly<br />

electrical test and this will similarly<br />

be carried out this year.<br />

of the spire, the roped access conserv<strong>at</strong>or<br />

abseils down each of the eight sides and<br />

records the condition of the masonry on<br />

survey drawings th<strong>at</strong> have previously been<br />

prepared.<br />

Over the last twelve months, the main<br />

project undertaken has been the re-lighting<br />

of the chancel and this, combined with the<br />

previous phases to relight the Lady Chapel<br />

now means th<strong>at</strong> the east end of the church<br />

has been entirely re-lit.<br />

Other projects undertaken include minor<br />

masonry repairs and footp<strong>at</strong>h repairs.<br />

As always, it is a gre<strong>at</strong> privilege to be involved<br />

in the upkeep of this magnificent building<br />

and it is a joy to be able to inspect some of<br />

the rarely visited parts of the church and to<br />

reflect on its remarkable construction.<br />

Marcus Chantrey<br />

Inspecting Architect<br />

Such is the uniqueness of the spire, th<strong>at</strong> a<br />

policy has also been adopted to undertake<br />

a five-yearly detailed inspection of the spire.<br />

As previously, this will be undertaken by<br />

Philip Scorer of Vitruvius - Philip has been<br />

inspecting the spire for approxim<strong>at</strong>ely 20<br />

years and over this time the condition of each<br />

stone has been monitored and recorded.<br />

Access to the top of the spire is provided by<br />

Dawsons <strong>St</strong>eeplejacks who secure a ladder<br />

to the outside thereby allowing ‘easy’ access<br />

for the roped access team. Once <strong>at</strong> the top<br />