Development, buildings and fabric<br />
Fabric report (a)<br />
Once every five years all the CofE churches<br />
in England are required under church law<br />
to have a quinquennial inspection of their<br />
building.<br />
In <strong>2022</strong>, the inspection is due for <strong>St</strong> <strong>Mary</strong><br />
<strong>Redcliffe</strong> and to do this, I have to spend a<br />
number of days inspecting all aspects of<br />
the building. The survey starts with roofs,<br />
rainw<strong>at</strong>er goods and walls, considers each<br />
of the windows, the churchyard and the<br />
entire interior of the church including all<br />
the roof spaces.<br />
The conclusion of the inspection is a report<br />
with recommend<strong>at</strong>ions for repairs. High<br />
priority works need to be undertaken within<br />
the next twelve months and lower priority<br />
works need to be scheduled for some<br />
point in the next 5 years. The high priority<br />
works generally rel<strong>at</strong>e to Health and Safety<br />
m<strong>at</strong>ters. In addition, a longer-term plan is<br />
also being developed to consider the next<br />
20-year period and the associ<strong>at</strong>ed potential<br />
costs. In addition to the report itself, there<br />
is also a requirement to carry out a fiveyearly<br />
electrical test and this will similarly<br />
be carried out this year.<br />
of the spire, the roped access conserv<strong>at</strong>or<br />
abseils down each of the eight sides and<br />
records the condition of the masonry on<br />
survey drawings th<strong>at</strong> have previously been<br />
prepared.<br />
Over the last twelve months, the main<br />
project undertaken has been the re-lighting<br />
of the chancel and this, combined with the<br />
previous phases to relight the Lady Chapel<br />
now means th<strong>at</strong> the east end of the church<br />
has been entirely re-lit.<br />
Other projects undertaken include minor<br />
masonry repairs and footp<strong>at</strong>h repairs.<br />
As always, it is a gre<strong>at</strong> privilege to be involved<br />
in the upkeep of this magnificent building<br />
and it is a joy to be able to inspect some of<br />
the rarely visited parts of the church and to<br />
reflect on its remarkable construction.<br />
Marcus Chantrey<br />
Inspecting Architect<br />
Such is the uniqueness of the spire, th<strong>at</strong> a<br />
policy has also been adopted to undertake<br />
a five-yearly detailed inspection of the spire.<br />
As previously, this will be undertaken by<br />
Philip Scorer of Vitruvius - Philip has been<br />
inspecting the spire for approxim<strong>at</strong>ely 20<br />
years and over this time the condition of each<br />
stone has been monitored and recorded.<br />
Access to the top of the spire is provided by<br />
Dawsons <strong>St</strong>eeplejacks who secure a ladder<br />
to the outside thereby allowing ‘easy’ access<br />
for the roped access team. Once <strong>at</strong> the top<br />