Nor'West News: May 19, 2022
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Thursday <strong>May</strong> <strong>19</strong> <strong>2022</strong> 5<br />
Collaboration a first for education<br />
Belfast School project<br />
co-ordinator Jon<br />
Rogers reports on the<br />
site blessing of a new<br />
concept in education<br />
LED BY Maaka Tau from<br />
Tuahiwi Marae, a blessing and<br />
sod-lifting ceremony was held<br />
in brilliant sunshine earlier this<br />
month.<br />
Two schools will be co-located<br />
on the site in a new subdivision<br />
by Johns Rd. There will be a<br />
senior campus for Belfast<br />
School and a completely<br />
new school for Allenvale Special<br />
School, currently situated in<br />
Bryndwr.<br />
The project marks new<br />
developments in education. This<br />
is the first time a special school<br />
has been co-located with a<br />
mainstream school, and also the<br />
first time a primary school has<br />
been split over two locations. The<br />
two schools plan to explore ways<br />
in which they can collaborate<br />
on the site to the benefit of all<br />
students.<br />
The design team is WSP<br />
(formerly OPUS) and the<br />
construction will be led by<br />
Leighs Construction, both of<br />
which have much experience in<br />
building schools in Canterbury.<br />
Allenvale Special School is<br />
really looking forward to a<br />
new, purpose-built school with<br />
TURNING THE SOD: Maaka Tau from Tuahiwi Marae<br />
oversees Belfast head prefect Olivia Johnston and deputy<br />
head prefect Bill Jiang turning the sod with Allenvale<br />
students Olivia Doig and George McManus. Above – an<br />
artist’s impression of the new schools.<br />
modern facilities to cater for<br />
their students’ diverse needs.<br />
Meanwhile, the new Belfast<br />
School will accommodate senior<br />
students in years 5-8.<br />
At the start of the planning<br />
process the Belfast community<br />
stated it did not want a new<br />
school to create competition<br />
and division in the community.<br />
Instead, it was decided to build a<br />
second, senior campus for<br />
Belfast School. It is planned that<br />
junior students in years 1-4 will<br />
stay on the current site on<br />
Main North Rd.<br />
The blessing ceremony was<br />
attended by a large number of<br />
people involved in the planning<br />
and construction process.<br />
Principals Ian Poulter (Allenvale)<br />
and Sue Elley (Belfast) spoke<br />
about their vision for the new<br />
co-located schools and thanked<br />
everyone in the Ministry of<br />
Education, planning, design<br />
and construction for their work<br />
in bringing the project to<br />
reality.<br />
It is expected the new schools<br />
will be ready for occupation<br />
towards the end of 2023.<br />
AUTUMN REFRESH DEAL<br />
GET $30 OFF!<br />
YOUR APPOINTMENT<br />
It's the time of year<br />
when your devices<br />
need refreshing<br />
before winter sets<br />
in! Whether that's<br />
a backup, security<br />
check, or simply a<br />
good clean, we've<br />
got your back!<br />
BOOK A GEEK!<br />
CALL 0800 424 335<br />
*Terms and Conditions: Price includes GST. To be eligible for the "Autumn Refresh" promotion, the<br />
appointment must exceed 90 minutes. Standard Appointments are booked for a minimum<br />
one-hour period. Any additional time is billed per quarter-hour. Cannot be used for Geek+<br />
memberships. This promotion cannot be used in conjunction with any other offer, limit one per<br />
customer. Offer valid until 31/05/<strong>2022</strong>