25.12.2012 Views

Security Profile for Advanced Metering Infrastructure - Open Smart ...

Security Profile for Advanced Metering Infrastructure - Open Smart ...

Security Profile for Advanced Metering Infrastructure - Open Smart ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

In<strong>for</strong>mation in Transit<br />

Link (Destination) In<strong>for</strong>mation Reference<br />

In<strong>for</strong>mational message receipt con<strong>for</strong>mation C2 – Sc5<br />

16 (HAN Display) Scheduled turn off notification<br />

Load limit notification and usage data<br />

Load control event notification<br />

Event start message<br />

Event end message<br />

Electric Price Data<br />

Energy Consumption Data<br />

Test message<br />

In<strong>for</strong>mational message<br />

Prepayment status<br />

Prepay meter event (i.e. credit mode)<br />

Unplanned outage in<strong>for</strong>mation<br />

Planned outage in<strong>for</strong>mation<br />

16 (Meter) Event notification confirmation<br />

Event start confirmation<br />

Event end confirmation<br />

<strong>Security</strong> <strong>Profile</strong> <strong>for</strong> <strong>Advanced</strong> <strong>Metering</strong> <strong>Infrastructure</strong> Version 1.0<br />

UtiliSec Working Group (UCAIug) December 10, 2009<br />

B2 – Sc1<br />

B2 – Sc6<br />

CDR&LC<br />

CDR&LC<br />

CDR&LC<br />

C2 – Sc1<br />

C2 – Sc1<br />

C2 – Sc2<br />

C2 – Sc5<br />

C3 – Sc1, Sc2, Sc4<br />

C3 – Sc4<br />

D4 – Sc1<br />

D4 – Sc3<br />

CDR&LC<br />

CDR&LC<br />

CDR&LC<br />

130

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!