25.12.2012 Views

Security Profile for Advanced Metering Infrastructure - Open Smart ...

Security Profile for Advanced Metering Infrastructure - Open Smart ...

Security Profile for Advanced Metering Infrastructure - Open Smart ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Line # Direction Summary of communication<br />

1 to AMI Meter Meter read requests, turn on/off commands, pricing data,<br />

provisioning requests, firmware updates, prepayment<br />

in<strong>for</strong>mation<br />

to AMI Head End Meter read data, various meter events (e.g., tampering,<br />

outage, and restoration), various confirmations (e.g., meter<br />

turn on/off, load shed start/end, and meter provisioning),<br />

HAN communication, error logs<br />

2 to MDMS Meter read data, various meter events and confirmations,<br />

HAN equipment responses, outage and restoration<br />

notifications, event logs<br />

to AMI Head End Meter read requests, load shed commands, planned outage<br />

in<strong>for</strong>mation, HAN equipment commands<br />

6 to AMI Head End Meter read data<br />

to Third Party<br />

Meter/Submeter<br />

Meter read requests<br />

9 to Field Tool/Device Stored meter data (including meter read data and ID) and<br />

logs, turn on/off confirmation, AMI system registration<br />

success, meter test results<br />

to AMI Meter Request <strong>for</strong> all meter data and logs, credentials <strong>for</strong> field<br />

person using Field Tool/Device, turn on/off commands,<br />

meter configuration data, request communication test and<br />

self-test results<br />

10 to MDMS Stored meter data<br />

to Field Tool/Device None identified<br />

11 to AMI Meter<br />

Problem meters report, meter service order request, meter<br />

Management System read data<br />

to MDMS Meter read requests, closed meter order status<br />

18 to AMI Meter<br />

Management System<br />

<strong>Security</strong> <strong>Profile</strong> <strong>for</strong> <strong>Advanced</strong> <strong>Metering</strong> <strong>Infrastructure</strong> Version 1.0<br />

UtiliSec Working Group (UCAIug) December 10, 2009<br />

Various meter events (e.g., intrusion, inversion, and<br />

customer load detected), meter status, meter location<br />

change or network disconnection, meter service order<br />

request, confirmation of firmware update download<br />

to AMI Head End Non-electric meter read requests, meter reconfiguration,<br />

updated firmware, command to execute firmware update,<br />

HAN device ping requests<br />

21 to AMI Network<br />

Management System<br />

Meter events, activity records<br />

to AMI Head End Non-electric meter read requests 4<br />

22 to AMI Head End Meter read data, establish connection confirmation, nonelectric<br />

meter events<br />

to Non Electric Meter Meter read requests, establish connection commands,<br />

meter event monitoring requests<br />

24 to MDMS Load shed control notification<br />

to DRAACS Load shed event end<br />

25 to DRAACS Load control request<br />

to Grid Control Center Load shed report<br />

4<br />

This probably shouldn't go from both AMI Management System and AMI Network Management System<br />

to Head End.<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!