25.01.2023 Views

airport-cdm-manual-2017 (1)

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE OF CONTENTS

TABLE OF CONTENTS

INTRODUCTION

ABBREVIATIONS AND ACRONYMS

DEFINITIONS

IV

IX

XI

XIX

1. UNDERSTANDING AIRPORT CDM 1-1

1.1 Understanding the impact 1-1

1.1.1 New working procedures 1-2

1.1.2 Culture change 1-2

1.2 From concept to implemenation 1-2

2. SETTING UP AN AIRPORT CDM PROJECT 2-1

2.1 General Airport CDM implementation process 2-1

2.2 Educating and convincing all partners 2-3

2.3 Setting the objectives 2-4

2.4 Setting the organisation structure 2-6

2.5 Programme and project management 2-8

2.6 Implementation order of Airport CDM Concept Elements 2-9

2.7 Inventory for implementation 2-10

2.8 Gap analysis and completeness assessment 2-10

3 IMPLEMENTATION 3-1

3.1 Introduction 3-1

3.2 Airport CDM Information Sharing 3-5

3.2.1 Objectives and scope 3-5

3.2.2 Requirements for implementation of Information Sharing 3-5

3.2.2.1 Airport CDM Platform 3-5

3.2.2.2 Information standards 3-6

3.2.2.3 Real-time information transmission 3-6

3.2.2.4 Platform procedures and processes 3-6

3.2.2.5 Alert messages 3-6

3.2.2.6 Human-Machine Interface (HMI) 3-6

3.2.3 High level information provided by main partners 3-8

3.2.4 Processing of information 3-11

3.2.4.1 Common data related to aircraft 3-11

3.2.4.2 Data extracted from the arrival flight information 3-12

3.2.4.3 Data extracted from the departure flight information 3-13

IV

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!