3.6 Airport CDM in Adverse Conditions 3-43

3.6.1 Objectives and scope 3-43

3.6.2 Requirements for implementation 3-43

3.6.2.1 Presence of other Concept Elements 3-43

3.6.2.2 Technical infrastructure 3-43

3.6.2.3 Human-Machine Interface (HMI) 3-43

3.6.2.4 Procedures 3-43

3.6.3 Testing and fine tuning 3-49

3.6.4 Regulatory aspects 3-50

3.7 Collaborative Management of Flight Updates 3-51

3.7.1 Objectives and scope 3-51

3.7.2 Requirements for implementation 3-53

3.7.2.1 Standards to be used 3-53

3.7.2.2 Regulatory aspects 3-53

3.7.3 Messages sent from the CDM Airport to the Network Operations 3-53

3.7.4 Messages sent from the Network Operations to the CDM Airport 3-55

3.7.5 Procedures to be used 3-55

3.7.6 Evaluation and deployment 3-55

4 PROJECT RISKS AND MITIGATION 4-1

4.1 General Airport CDM risks and their mitigation 4-1

4.2 Local project risks and their mitigation 4-8

5 HOW TO MEASURE SUCCESS 5-1

5.1 Reviewing the agreed objectives 5-1

5.2 Agreeing performance indicators appropriate for the objectives 5-1

5.3 Measuring performance 5-2

5.4 Reporting mechanisms and feedback 5-2

6 POST - IMPLEMENTATION ACTIVITIES 6-1

6.1 Airport CDM becomes a daily operation 6-1

6.2 Continued education of all partners 6-1

6.3 Preparing for new functions 6-1

6.4 International participation 6-2

VI