www.elester-pkp.com.pl<br />

Installation of the meter in a traction<br />

substation or in a section cubicle<br />

Installation of the meter in a traction substation<br />

The LE <strong>3000plus</strong> Energy Meter can be installed in a traction substation (rectifying station) and used<br />

for counting the power returned to the 3.3 kV (660 V) switching station by rectifying sets. This solution<br />

allows for monitoring the efficiency of traction transformers and rectifiers. The system for measuring<br />

the power returned to the DC switching<br />

station is shown in the figure. In this system,<br />

the meter's measuring shunt is included<br />

in the collective rail of the “plus” pole,<br />

between the cathodes of the rectifying sets<br />

and outflows to the traction line (fields<br />

of traction power units). Construction of<br />

the LE <strong>3000plus</strong> HVM measuring transducer<br />

and the LE <strong>3000plus</strong> KOM communication unit<br />

is identical as in case of the solution for traction<br />

vehicles, however the communication unit<br />

is adapted to be powered by 220 V DC or<br />

230 V DC voltage from own needs switching<br />

station of the traction substation.<br />

Installation of the meter in a section<br />

cubicle<br />

The LE <strong>3000plus</strong> electricity meter can<br />

also be installed in a section cubicle at the<br />

border of two infrastructure administrations.<br />

Depending on the cubicle function, the meter<br />

can be installed on a collective rail or on<br />

a selected outflow (e.g. to an electric<br />

locomotive depot or ZNTK Rolling Stock<br />

Repair Plants). The meter's communication<br />

unit is powered from cubicle's own needs<br />

with 230V AC or 220V DC voltage.<br />

An example diagram of a 3.3 kV<br />

measuring system in a section cubicle is<br />

shown on the right.<br />

The first LE <strong>3000plus</strong> energy meter in<br />

a cubicle version was installed in<br />

KS Newag Nowy S¹cz as ordered<br />

by “<strong>PKP</strong> Energetyka” Southern<br />

Plant. It is used for settlements<br />

of electricity supplied to a siding<br />

of the NEWAG S.A. plants.<br />

Section cubicle<br />

<strong>PKP</strong> PLK S.A.s' traction line<br />

6<br />

Traction line of another company<br />

0<br />