SITING THE uB<strong>VIP</strong><br />

<strong>The</strong> site should be chosen by the family with assistance from the<br />

Environmental Health Technician and should be at least 30<br />

metres from a well. <strong>The</strong> toilet site should be:<br />

*Down hill from a well or borehole – to reduce possible<br />

underground contamination of the water supply.<br />

*Where the soil is firm – to avoid possible latrine collapse<br />

*On slightly raised ground – so that rainwater can drain<br />

away from the site of the toilet<br />

*Near the house – for the convenience of the householders<br />

*Away from trees – so that air can flow easily over the<br />

pipe<br />

*<strong>The</strong> orientation of the structure - to provide the best<br />

privacy for the users<br />

Stages of construction<br />

<strong>The</strong> stages of construction are as follows:<br />

1. Dig the pit.<br />

2. Make the concrete slab<br />

3. Line the pit with bricks and fit the cured slab<br />

4. Build the superstructure<br />

Stage 1. Dig the pit<br />

Dig a round pit 2m deep and 1.7m in diameter. Dig the<br />

pit with straight sides and a flat bottom.<br />