Savings are achievable in three major areas:

• Time - Time saving; labour reduction up to 50%

compared to traditional way of building.

• Design - The lightness of the panels allows in

reduction of the design components; foundation,

columns and beams reducing the overall dead

weight of the building and bringing the cost

down by up to 20%.

• Materials – Up to 15 % cumulative material

savings ranging from; reinforcements, concrete,

formwork, electrical conduits, and cables is

achievable.

C-MAX Vs Traditional Building Case study

Over the past few years, we have been collecting data

on projects we have successfully delivered; below is a

case study of one of these projects with head-to-head

cost comparison between C-MAX Advanced Building

System and traditional building methodologies.

This project in Nairobi adopted the C-MAX slab panels

on their multi-storey residential apartment. Leading

to reduction of concrete and steel quantities in the

structure and a huge cost savings as detailed below:

Strategies and Knowledge Necessary to Thrive in

the Dynamic Landscape.

The C-MAX Advanced Building System is used

for partitioning or as a load bearing element i.e.,

slabs. It’s a high-speed adoption that can be easily

integrated with any conventional construction

material, making it a very suitable technology to use

for both residential and commercial properties. You

can use this green building technology with steel

frames, concrete frames, or stones, and if design

allows, we can integrate all of them together.

In summary, there is no silver bullet for attacking

the runaway development cost in the real estate

sector, but conventional wisdom dictates that

we take a multipronged approach. This approach

includes sourcing lower cost of funds, and using fast

and green build technologies like C-MAX Advanced

Building System that compresses the construction

period and thus reduce the level of uncertainty and

the premium associated with it.

22% cost saving using C-MAX slab panel!