23.02.2024 Views

+IMPACT MAGAZINE ISSUE 27

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GBCSA AWARDS<br />

GBCSA AWARDS<br />

BEST-QUALITY SUBMISSION<br />

FOR EXISTING OPERATIONAL<br />

PERFORMANCE<br />

JOINT WINNER: 29 SPRINGBOK ROAD, JOHANNESBURG<br />

29 Springbok Road, Bartlett, Boksburg<br />

Accredited professional: Sally Misplon, Misplon Green Building Consulting<br />

“Winning the Best Quality Submission award at the<br />

annual GBCSA convention is truly a momentous<br />

achievement for Misplon Green Building Consulting,”<br />

says AP Sally Misplon. Being recognised by our industry<br />

peers for the high standard of work we deliver to our<br />

clients is an incredibly meaningful acknowledgment.<br />

This recognition is not just an individual triumph but<br />

a collective effort, and credit is due to everyone involved.”<br />

Project type:<br />

Project owner:<br />

Certification:<br />

Project size:<br />

JOINT WINNER: ERPM<br />

Industrial distribution centre<br />

Redefine Properties<br />

4-Star Green Star Existing Building<br />

Performance Custom Industrial PILOT<br />

22 067m2<br />

Comet Ext 14, Boksburg, Johannesburg<br />

Accredited professional: Sally Misplon,<br />

Misplon Green Building Consulting<br />

TRANSFORMING TOMORROW:<br />

ASSET PROJECTS<br />

WINNER: HASSO PLATTNER D-SCHOOL AFRIKA, UNIVERSITY OF CAPE TOWN<br />

Cnr Cross Campus Road & Woolsack Drive, UCT Middle Campus, Rondebosch, Cape Town<br />

Accredited professionals: Mlondolozi (Mlo) Hempe and Yogesh Gooljar, PJC + Partners<br />

“In building a home for ourselves, it was important<br />

that we built a place that enhances the behaviour of<br />

innovation but also embodied tackling one of our world’s<br />

grand challenges related to environmental sustainability<br />

and climate change. We needed a home that was going<br />

to be a beacon for this,” says Director of the Hasso<br />

Plattner d-school Afrika Richard Perez.<br />

Project type:<br />

Project owner:<br />

Certification:<br />

Project size:<br />

Public and education building<br />

University of Cape Town/d-school Afrika<br />

6-Star Green Star Public and Education Building V1<br />

4 487m2<br />

RUNNER-UP: PICK N PAY CLOTHING, BLUE ROUTE STORE, CAPE TOWN<br />

Shop F154, Blue Route Mall, Tokai Road, Tokai, Cape Town<br />

Accredited professional: Fabio Venturi, Terramanzi Group<br />

“The Green Star certification and the Transforming<br />

Tomorrow: Asset Projects runner-up award signifies that<br />

Pick n Pay Clothing is committed to environmentally<br />

sustainable practices. It reflects our efforts to minimise<br />

environmental impact, promote ethical sourcing, and<br />

support sustainable manufacturing processes. These<br />

awards showcase Pick n Pay Clothing’s dedication to<br />

sustainable and responsible business operations,” says<br />

Abdulhaliem Vogt, Head of Store Planning, Pick n Pay.<br />

Paris Brummer and d-school Afrika<br />

Project type: Shopping mall retail store<br />

Project owner: Pick n Pay Clothing Blue Route Store<br />

Certification: 4-Star Green Star Interiors V1<br />

Project size: 578m²<br />

Project type:<br />

Project owner:<br />

Certification:<br />

Project size:<br />

Industrial park with mixed-use tenants<br />

Redefine Properties<br />

4-Star Green Star Existing Building Performance Custom Industrial PILOT<br />

67 742m2<br />

Note: The runner-up in this category opted to remain confidential<br />

20 POSITIVE IMPACT <strong>ISSUE</strong> <strong>27</strong><br />

POSITIVE IMPACT <strong>ISSUE</strong> <strong>27</strong><br />

21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!