30.12.2012 Views

Britannia Contaminated Sites Investigation Stage I Preliminary Site ...

Britannia Contaminated Sites Investigation Stage I Preliminary Site ...

Britannia Contaminated Sites Investigation Stage I Preliminary Site ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 13<br />

Head of Incline & 2700 Portal Area<br />

Potential Issues Findings<br />

Underground Storage No evidence of USTs or ASTs was observed.<br />

Tanks and Aboveground<br />

Storage<br />

Tanks(USTs/ASTs)<br />

Hazardous Building N/A<br />

Materials (PCBs,<br />

asbestos, ozone-depleting<br />

substances)<br />

4.2.5 Halfway Town<br />

No evidence of the existence of Halfway Town was observed during the site reconnaissance.<br />

4.3 LAND USE AT ADJACENT LANDS<br />

Logging is underway in the surrounding mountains to the north, east and south of the <strong>Britannia</strong><br />

Mine. Residential land use exists on the north side of <strong>Britannia</strong> Creek. There is a small area of<br />

commercial development to the south of the Fan Area, with a gravel pit located just beyond.<br />

Residential, recreational and resort development at Furry Creek are several kilometres southwest<br />

of the Victoria Camp.<br />

5.0 PROTOCOL 5<br />

Section 60 of the <strong>Contaminated</strong> <strong><strong>Site</strong>s</strong> Regulation requires that each preliminary site investigation<br />

or PSI report submitted to the Ministry for review include a summary of the report or plan for the<br />

purpose of entry on the site registry. Protocol 5, Establishing a Format for Summaries of <strong>Site</strong><br />

<strong>Investigation</strong> Reports and Remediation Plans, has been in effect since December 1, 1998. It<br />

formalizes the requirements for consultants when submitting preliminary site investigation and<br />

detailed site investigation reports and/or remediation plans to BCMWLAP. It consists of a<br />

checklist, signature/credential page, and statistical interpretation of summarized information.<br />

Protocol 5 Appendix B, Summary of Report Participants, and Appendix C, Report Summary –<br />

<strong>Site</strong> Information Summary, required with submission to BCMWLAP of <strong>Stage</strong> I PSI reports, have<br />

been completed by URS and are located at the back of this report. Protocol 5 has also been<br />

provided in a digital format as required by BCMWLAP.<br />

<strong>Britannia</strong> <strong>Contaminated</strong> <strong>Site</strong> <strong>Investigation</strong><br />

<strong>Stage</strong> I <strong>Preliminary</strong> <strong>Site</strong> <strong>Investigation</strong><br />

Project No. 50319-001-310 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!