07.01.2013 Views

National PMDT Scale-up Plan - India - 2011-12 - TBC India

National PMDT Scale-up Plan - India - 2011-12 - TBC India

National PMDT Scale-up Plan - India - 2011-12 - TBC India

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

List of Tables:<br />

<strong>National</strong> <strong>Scale</strong> <strong>up</strong> <strong>Plan</strong> for Programmatic Management of DR TB <strong>2011</strong> - 20<strong>12</strong><br />

Table 1: State Representative Drug Resistance Surveillance Surveys conducted in <strong>India</strong><br />

Table 2: <strong>PMDT</strong> Implementation Status and Progress – 2007 to 2010<br />

Table 3: Elements and timelines of <strong>National</strong> Lab <strong>Scale</strong> <strong>up</strong> <strong>Plan</strong> for 43 laboratories<br />

Table 4: Laboratories for Solid Culture and DST and Line Probe assay<br />

Table 5: Resources for procurement of second line drugs with timelines<br />

Table 6: Assumptions of MDR TB Rates based on Suspect Criteria and by diagnostic test<br />

Table 7: Expansion by MDR TB Suspect Criteria……move towards Universal Access<br />

Table 8: <strong>National</strong> Lab Capacity v/s Demand – Summary of Variation by States<br />

Table 9: States with Diagnostic Deficit that need back <strong>up</strong> laboratory s<strong>up</strong>port<br />

Table 10: States with Follow <strong>up</strong> Deficit that need back <strong>up</strong> laboratory s<strong>up</strong>port<br />

Table 11: Checklist for switching over the MDR TB criteria’s from ‘A’ to ‘B’<br />

Table <strong>12</strong>: Summary of <strong>Scale</strong> <strong>up</strong> by Geography and Suspects Criteria<br />

Table 13: Drug Envelop by States (15 months working stock)<br />

Table 14: DOTS Plus Sites planned by the states v/s eligibility based on population norm<br />

Table 15: Overview of Appraisals, S<strong>up</strong>ervision, Monitoring and Evaluation Strategy for <strong>PMDT</strong><br />

Table 16: Summary of Key Risks and Potential Mitigation Strategies for the scale <strong>up</strong> of <strong>PMDT</strong><br />

List of Figures:<br />

Figure 1: <strong>Plan</strong> for patients to be tested and treated for MDR TB in <strong>India</strong><br />

Figure 2: <strong>National</strong> Cumulative Accreditations of Laboratories by Technology<br />

Figure 3: <strong>National</strong> Lab - Diagnostic Capacity vs. Demand<br />

Figure 4: <strong>National</strong> Lab - Follow Up Capacity vs. Demand<br />

Figure 5: Flow chart on Diagnostic Algorithm for MDR TB Suspect’s in criteria B subjected to LPA<br />

Figure 6: <strong>India</strong>’s Enrollment <strong>Plan</strong> of MDR TB Suspects and Cases in <strong>2011</strong> and 20<strong>12</strong><br />

Figure 7: <strong>PMDT</strong> Coverage by Geography and Suspect’s Criteria – As on December 2010<br />

Figure 8: <strong>Plan</strong>ned <strong>PMDT</strong> Coverage by Geography & Suspect’s Criteria – As on December 20<strong>12</strong><br />

Figure 9: <strong>India</strong>’s Enrollment <strong>Plan</strong> of MDR TB Cases aligned to available Drug Envelop for <strong>2011</strong> and 20<strong>12</strong><br />

Figure 10: <strong>India</strong>’s Enrollment <strong>Plan</strong> of MDR TB Cases with Deficit/Surplus of Drug Envelop (15m) for <strong>2011</strong><br />

and 20<strong>12</strong><br />

Figure 11: Demand for <strong>National</strong> <strong>PMDT</strong> Training to meet the scale <strong>up</strong> plan<br />

Figure <strong>12</strong>: Demand for <strong>National</strong> <strong>PMDT</strong> Appraisals of Districts to meet the scale <strong>up</strong><br />

Figure 13: Tracking of key metrics in the scale <strong>up</strong> plan<br />

Annexure:<br />

Annexure 1: Agenda for State Wise <strong>PMDT</strong> <strong>Scale</strong> <strong>up</strong> planning meetings………………………………………………...41<br />

Annexure 2: Standard <strong>Plan</strong>ning Worksheet for <strong>PMDT</strong> <strong>Scale</strong> <strong>up</strong> <strong>Plan</strong> by States……………………………………….42<br />

Annexure 3: <strong>Scale</strong> <strong>up</strong> of <strong>PMDT</strong> Services by Geographical coverage of all States over quarters by<br />

<strong>2011</strong>………………………………………………………………………………………………………………………………………………………47<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!