07.01.2013 Views

Sogea - 1999 annual report - Vinci

Sogea - 1999 annual report - Vinci

Sogea - 1999 annual report - Vinci

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

16<br />

1. <strong>Sogea</strong> Sud,<br />

as general contractor,<br />

built 41 public housing<br />

units at the Cres,<br />

near Montpellier,<br />

for the Arcade Group;<br />

this was an Experimental<br />

Works project using<br />

the Styltech (Usinor)<br />

process.<br />

2. As part of the<br />

Millenium festivities,<br />

Norwest Holst built<br />

the extension of<br />

the National Portrait<br />

Gallery in London.<br />

3. Norwest Holst<br />

completed construction<br />

of a 1,700 space capacity<br />

car park and a multiplex<br />

in the Oracle shopping<br />

centre in Berkshire.<br />

1<br />

2<br />

BUILDING<br />

company’s selection to do the structural work on<br />

the Majicavo Koropa school complex (Atelier<br />

d’architecture du Lagon-M. Villaume) and the<br />

municipal centre in Koungou (Mayotte architecture-<br />

M. Henion) in Mayotte.<br />

In the French West Indies, Dodin Guadeloupe is<br />

specialized in social housing. This year the company<br />

won the contract, for example, for construction of<br />

154 social housing units in Baie-Mahault (architects:<br />

Cirany-Houelche-Boucher) and 140 units in Morne-àl’Eau<br />

(architects: Mocka Célestine-Berthelot-Romney-<br />

Jalet). In Martinique, while <strong>Sogea</strong> was completing<br />

construction of the Schoelcher towers (architect:<br />

Montjoly) it was awarded the structural contract for<br />

274 studio apartments on the same campus (architects:<br />

Cabinet Fontes & Arnihac). <strong>Sogea</strong> Martinique was also<br />

the winner of the bidding for the structural work on<br />

96 housing units in Saint-Pierre.<br />

In Africa, <strong>Sogea</strong> won the contract to renovate the<br />

airport in Timbuktu, Mali, as well as to build two<br />

hospitals in Port-Gentil and Koulamoutou, Gabon.<br />

Finally, the company was awarded the contract to

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!