07.01.2013 Views

Sogea - 1999 annual report - Vinci

Sogea - 1999 annual report - Vinci

Sogea - 1999 annual report - Vinci

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4<br />

3. In July <strong>1999</strong>,<br />

Aimé Césaire, Mayor<br />

of Fort-de-France,<br />

inaugurated the Dillon<br />

water treatment plant<br />

built by <strong>Sogea</strong> Martinique.<br />

4. Sobea Île-de-France<br />

built the second pipe to<br />

channel water between<br />

the Vals de Seine and<br />

the Grande-Paroisse,<br />

in the Seine-et-Marne.<br />

PROCESS WATER<br />

Successes overseas and in mainland France<br />

<strong>Sogea</strong> Process Water, associated with several <strong>Sogea</strong> regional<br />

departments, achieved several successes this summer in using<br />

innovative water purification and treatment technologies<br />

developed by US Filter Memcor. In the overseas departments and<br />

territories, <strong>Sogea</strong>’s Process Water department won two contracts<br />

on Reunion Island. The first relates to the construction of<br />

drinking water treatment plants in the Le Port and La Possession<br />

municipalities. The second contract, won with <strong>Sogea</strong> Réunion,<br />

relates to deodorizing through chemical scrubbing the facilities<br />

of the “La Jamaïque” purification plant.<br />

In mainland France, the company won the contract to build the<br />

Vaujany plant in the Isère (capacity: 70 l/s). A second contract,<br />

awarded to <strong>Sogea</strong> and its subsidiary <strong>Sogea</strong> Nord-Ouest, is for<br />

the supply of the process and the equipment for the Douai-Siado<br />

sludge drying unit.<br />

3<br />

31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!