07.01.2013 Views

Sogea - 1999 annual report - Vinci

Sogea - 1999 annual report - Vinci

Sogea - 1999 annual report - Vinci

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2<br />

2. Dodin completed<br />

construction of a second<br />

Saint-Denis Viaduct,<br />

near the Stade de France,<br />

in early 2000.<br />

3. Dodin is building<br />

the Rauze Viaduct on<br />

the A20 Motorway for<br />

the Autoroutes du Sud<br />

de la France. Composed<br />

of a single girder deck<br />

resting on piers which<br />

are more than 100 metres<br />

high, the structure will<br />

be 555 metres long and<br />

24 metres wide, with<br />

spans of 130 metres.<br />

4. Dodin is currently<br />

building 15 standard<br />

engineering structures<br />

on the A87 Motorway<br />

between Angers<br />

and la Roche-sur-Yon.<br />

In the overseas departments, <strong>Sogea</strong> is recognized<br />

today as one of the main civil engineering operators,<br />

particularly in the area of the environment.<br />

In Africa, where <strong>Sogea</strong> and its subsidiary Satom<br />

generate half their business in roadworks, the group<br />

is now also expanding onto the engineering structure<br />

market.<br />

In Europe, Norwest Holst is one of the major British<br />

earthmoving and environment-related civil<br />

engineering companies and it also builds engineering<br />

structures. Finally, Denys remains very active in high<br />

tech civil engineering (tunnel boring, microtunnelling,<br />

underground works).<br />

Activity<br />

In mainland France, after handing over the Tanus<br />

motorway viaduct (architect: Ph. Fraleu) and the<br />

Vernègues high speed rail viaduct (architect: Amadeo),<br />

Dodin began construction of the Verrières Viaduct<br />

(architect: Mascarelli) near Millau and la Rauze<br />

Viaduct (architect: Lavigne) in the Lot whose tallest<br />

piers reach a height of more than 140 m.<br />

The company also continued the expansion of the Saint-<br />

Denis Viaduct in the Paris area; several engineering<br />

structures on the A89 (Bordeaux-Clermont-Ferrand),<br />

A87 (Angers-La-Roche-sur-Yon), A66 (Toulouse-<br />

Pamiers) and A20 (Brive-Toulouse) Motorways;<br />

maritime works in the Toulon naval shipyard and the<br />

port of Saint-Nazaire. Finally, Dodin began work on<br />

3 4<br />

VAL DE RENNES<br />

A deck on crutches<br />

<strong>Sogea</strong> Bretagne has completed the construction of the North<br />

Viaduct of the future Val de Rennes, a 755 m long structure<br />

whose construction got underway in July 1998 (architect:<br />

Foster). The outstanding technical feature of this viaduct is<br />

that its deck rests on 17 metal crutches which are between 3.5<br />

and 4.5 metres high and weigh 30 tons each, a system which<br />

took several months to design. In addition, <strong>Sogea</strong> teams were<br />

forced to solve a difficulty related to the general profile of<br />

the structure and the slope of the deck which is 10% in some<br />

places. On both sides of the viaduct <strong>Sogea</strong> Bretagne also built<br />

the access ramps which are 100 m long and lead to cut and<br />

cover trenches for which Dodin was responsible.<br />

21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!