<strong>DGE</strong>-Project: 0319-1401-0 Biogas treatment Issue 01: 10.07.2004<br />
Return time in years<br />
80<br />
70<br />
60<br />
50<br />
40<br />
30<br />
20<br />
10<br />
0<br />
<strong>DGE</strong>-process for biogas treatment<br />
calculated amortisation of the process<br />
100 200 300 400 500 600 700 800 900 1000<br />
Biogas flow in Nm³/h<br />
BCM-0 BCM-1<br />
BCM-2 BCM-3<br />
BCM-4<br />
without CO 2-Emission trade App. 2-3