09.01.2013 Views

Singapore - Trenchless International

Singapore - Trenchless International

Singapore - Trenchless International

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

News<br />

October 2010 - <strong>Trenchless</strong> <strong>International</strong><br />

14<br />

thames goes virtual<br />

thames Water has launched an online map to give an overview of their £5 billion<br />

planned work to upgrade its ageing water pipes, sewers and other facilities over the<br />

next five years.<br />

Counties or London boroughs can be clicked on the website’s Big Map for an outline<br />

of what thames Water is planning to do area by area between 2010 and 2015.<br />

Further detail will be added to the map later in the five-year period as project plans<br />

are finalised. Visit www.thameswater.co.uk/thebigmap for more information.<br />

Georgia has CIPP on its mind<br />

the Macon Water Authority has awarded a contract for the rehabilitation<br />

of its wastewater pipelines using cured-in-place pipe (CIPP) located in<br />

Georgia, Us.<br />

the $Us5.2 million contract has been awarded to Insituform to rehabilitate<br />

over 24,000 feet of pipelines. the project includes 9,500 feet of<br />

54 inch diameter pipelines located in Central City Park.<br />

Work is expected to commence in september and take approximately<br />

twelve months to complete.<br />

Relining san diego’s sewers<br />

Construction will soon begin on a sewer rehabilitation project in san Diego,<br />

Us, with the relining of pipes as part of a program established by the city<br />

with the Environmental Protection Agency.<br />

the cost of the project is estimated at $Us1,689,593, which includes<br />

design, construction and inspection and consists of rehabilitating approximately<br />

590 existing 4 inch diameter service laterals (3.35 miles maximum)<br />

occurring in the city’s right of way.<br />

Construction is scheduled to commence at the end of september 2010<br />

and will be completed by June 2011.<br />

Prime Horizontal Companies<br />

The Netherlands: +31 (0)251 271 790<br />

In USA: 1-570-675-0901<br />

www.primehorizontal.com<br />

Precision.<br />

Accuracy.<br />

Professionalism.<br />

HDD Guidance Services<br />

ParaTrack Distributor<br />

Drilling Tool Sales and Rental

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!