BASIC INFRASTRUCTURE<br />

AND AMENITIES<br />

Overview<br />

Infrastructure plays a pivotal role in supporting the manufacturing industry. The primary components for<br />

basic infrastructure and amenities are roads and transportation services, water supply and distribution,<br />

electrical supply, gas supply, sanitation-wastewater collection and removal as well as solid waste<br />

collection and removal. These services are bundled together to support business activities in the<br />

surrounding Pasir Gudang area.<br />

Power Supply<br />

The key directions in Flagship D are to ensure: (i) sufficient supply of power to cater for the growth of<br />

<strong>Iskandar</strong> <strong>Malaysia</strong>; (ii) its objective of becoming a world-class sustainable conurbation; and<br />

(iii) the reliability of power within <strong>Iskandar</strong> <strong>Malaysia</strong>. The present supply of electric power in Flagship D is<br />

sufficient. Based on the following supply and demand table, the capacities of all main intake substations<br />

are able to meet the demand.<br />

Projection Of Power Supply Demand In Flagship D (2000 - 2025)<br />

Sector 2005 2010 2015 2020 2025<br />

Domestic 186.21 202.59 234.81 287.87 359.84<br />

Commercial 111.72 121.56 140.88 172.72 215.90<br />

Industry 55.86 60.78 70.44 86.36 107.95<br />

Sub total 353.80 384.93 446.13 546.96 683.70<br />

Street Lighting<br />

(5%)<br />

18.62 20.26 23.48 28.79 35.98<br />

Total (MW) 372.42 405.19 469.61 575.75 719.68<br />

Source: Comprehensive Development Plan (CDP)<br />

The proposed targets for power supply for <strong>Iskandar</strong> <strong>Malaysia</strong> are as follows:<br />

• Improve System Average Interruption Duration Index (SAIDI) from the current 105 minutes/customer/<br />

year (2004) to less than 20 minutes/customer/year.<br />

• System Average Interruption Frequency Indexes (SAIFI) from 1.11 (2004) to less than 0.5.<br />