09.01.2013 Views

FLAGSHIP D - Iskandar Malaysia

FLAGSHIP D - Iskandar Malaysia

FLAGSHIP D - Iskandar Malaysia

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Proposed Primary Road Development<br />

Source: Comprehensive Development Plan (CDP)<br />

Transit Oriented Development<br />

By 2010, the population in <strong>Iskandar</strong> <strong>Malaysia</strong> is forecasted to be 1.5 million, of which about 0.54 million<br />

and 0.59 million are within the Majlis Perbandaran Johor Bahru (MPJB) and Majlis Perbandaran Johor<br />

Bahru Tengah (MPJBT). Therefore, for the ultimate in integration, the Government has proposed the<br />

development of the Light Rail Transit (LRT) as well as the Mass Rapid Transit (MRT) System. The LRT will<br />

include a 59 km route connecting Pasir Gudang-Nusajaya, totaling RM2.66 billion, to be completed by<br />

2020.<br />

Proposed Development Of Light Rail Transit (LRT)<br />

Routes Route No. Of Travel Time Implementation Indicative Cost<br />

Length (km) Stations (1-way trip) Phase (RM million)<br />

Pasir Gudang 59.0 19 120 minutes 2016 - 2020 2,660.0<br />

-Nusajaya<br />

Source: Comprehensive Development Plan (CDP)<br />

Proposed Development Of Mass Rapid Transit (MRT)<br />

Routes Route No. Of Travel Time Implementation Indicative Cost<br />

Length (km) Stations (1-way trip) Phase (RM million)<br />

JB Sentral II-PTP 36.0 11 55 minutes 2011 - 2015 495.0<br />

Source: Comprehensive Development Plan (CDP)<br />

15<br />

Eastern Gate Development

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!