FLAGSHIP D - Iskandar Malaysia
FLAGSHIP D - Iskandar Malaysia
FLAGSHIP D - Iskandar Malaysia
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Proposed Primary Road Development<br />
Source: Comprehensive Development Plan (CDP)<br />
Transit Oriented Development<br />
By 2010, the population in <strong>Iskandar</strong> <strong>Malaysia</strong> is forecasted to be 1.5 million, of which about 0.54 million<br />
and 0.59 million are within the Majlis Perbandaran Johor Bahru (MPJB) and Majlis Perbandaran Johor<br />
Bahru Tengah (MPJBT). Therefore, for the ultimate in integration, the Government has proposed the<br />
development of the Light Rail Transit (LRT) as well as the Mass Rapid Transit (MRT) System. The LRT will<br />
include a 59 km route connecting Pasir Gudang-Nusajaya, totaling RM2.66 billion, to be completed by<br />
2020.<br />
Proposed Development Of Light Rail Transit (LRT)<br />
Routes Route No. Of Travel Time Implementation Indicative Cost<br />
Length (km) Stations (1-way trip) Phase (RM million)<br />
Pasir Gudang 59.0 19 120 minutes 2016 - 2020 2,660.0<br />
-Nusajaya<br />
Source: Comprehensive Development Plan (CDP)<br />
Proposed Development Of Mass Rapid Transit (MRT)<br />
Routes Route No. Of Travel Time Implementation Indicative Cost<br />
Length (km) Stations (1-way trip) Phase (RM million)<br />
JB Sentral II-PTP 36.0 11 55 minutes 2011 - 2015 495.0<br />
Source: Comprehensive Development Plan (CDP)<br />
15<br />
Eastern Gate Development