11.01.2013 Views

Stationary Source Control Techniques Document for Fine Particulate ...

Stationary Source Control Techniques Document for Fine Particulate ...

Stationary Source Control Techniques Document for Fine Particulate ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLES (continued)<br />

Table 5.4-2 Current Industrial Applications of Wet Scrubbers<br />

(References 1, 2, and 8) .........................................5.4-22<br />

Table 5.4-3 PM 10/PM 2.5 <strong>Control</strong> Potential <strong>for</strong> Various Scrubber Designs ..............5.4-23<br />

Table 5.4-4 Capital Cost Factors <strong>for</strong> a Typical Scrubber (Reference 9). ..............5.4-25<br />

Table 5.4-5 Recommended Gas Velocities, Liquid/Gas Ratios, and<br />

Pressure Drops <strong>for</strong> <strong>Particulate</strong> Wet Scrubbers (Reference 10). ............5.4-26<br />

Table 5.4-6 Annual Cost Parameters <strong>for</strong> <strong>Particulate</strong> Scrubbers<br />

(Reference 11). ...............................................5.4-32<br />

Table 5.4-7 Annual Cost Factors <strong>for</strong> <strong>Particulate</strong> Scrubbers (Reference 11). ............5.4-33<br />

Table 5.5-1 PM <strong>Control</strong> Efficiencies <strong>for</strong> Thermal Incinerators in<br />

Phthalic Anhydride Manufacturing Processes (Reference 10) ...............5.5-9<br />

Table 5.5-2 Operational Requirements <strong>for</strong> Satisfactory Incinerator<br />

Per<strong>for</strong>mance <strong>for</strong> Various Industrial Applications and<br />

<strong>Control</strong> Levels (Reference 3) .....................................5.5-11<br />

Table 5.5-3 Capital Cost Factors <strong>for</strong> Thermal Incinerators (Reference 11) .............5.5-13<br />

Table 5.5-4 Incinerator Annual Cost Parameters (Reference 11) ....................5.5-16<br />

Table 5.5-5 Annual Cost Factors <strong>for</strong> Incinerators (Reference 12). ...................5.5-17<br />

Table 6.1 Estimated <strong>Control</strong> Efficiencies <strong>for</strong> Drop Height<br />

Reduction <strong>Techniques</strong> (Reference 7) .................................. 6-6<br />

Table 6-2 Parameters <strong>for</strong> Hood Cost Equation (Reference 8) ....................... 6-9<br />

Table 7-1 Summary of Emerging PM <strong>Control</strong> Technologies ........................ 7-2<br />

x

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!