Contents<br />

OVERVIEW ........................................................................................................................i<br />

1 INTRODUCTION ............................................................................................... 1-1<br />

1.1 Purpose of Guidelines.............................................................................. 1-1<br />

1.2 Description of HDD................................................................................. 1-2<br />

1.2.1 Pre-Site <strong>Planning</strong> ......................................................................... 1-2<br />

1.2.2 <strong>Drilling</strong> the Pilot Hole.................................................................. 1-4<br />

1.2.3 Reaming of the Pilot Hole............................................................ 1-4<br />

1.2.4 Pipe String Pull back.................................................................... 1-4<br />

1.3 Workspace Requirements ........................................................................ 1-5<br />

2 REGULATORY AND INFORMATION REQUIREMENTS............................ 2-1<br />

2.1 Federal Jurisdictions ................................................................................ 2-1<br />

2.1.1 Fisheries Act ................................................................................ 2-1<br />

2.1.2 Navigable Waters Protection Act................................................. 2-2<br />

2.1.3 Other Federal Legislation ............................................................ 2-3<br />

2.2 Provincial and Territorial Jurisdictions.................................................... 2-4<br />

2.3 Other Guidance ........................................................................................ 2-4<br />

3 SELECTION OF HDD AS THE PREFERRED CROSSING METHOD........... 3-1<br />

3.1 <strong>Pipeline</strong> Route Section............................................................................. 3-1<br />

3.2 Crossing Location Selection .................................................................... 3-1<br />

3.3 Crossing Method Selection...................................................................... 3-1<br />

3.4 Other Selection Issues.............................................................................. 3-2<br />

3.4.1 Access .......................................................................................... 3-2<br />

3.4.2 Drill Entry and Exit Site Selection............................................... 3-3<br />

3.4.3 No Drill Zone............................................................................... 3-3<br />

4<br />

3.4.4 Water Source................................................................................ 3-4<br />

RISK CONSIDERATIONS................................................................................. 4-1<br />

4.1 Regulatory Risk ....................................................................................... 4-1<br />

4.2 <strong>Construction</strong> Risk..................................................................................... 4-2<br />

4.3 Operations Risk........................................................................................ 4-3<br />

5 ECONOMIC CONSIDERATIONS..................................................................... 5-1<br />

5.1 Potential Economic Advantages of HDD ................................................ 5-1<br />

5.2 Costs of HDD Applications ..................................................................... 5-1<br />

5.3 Direct Costs and Benefits of HDD Applications ..................................... 5-2<br />

5.4 Indirect Costs and Benefits of HDD Applications................................... 5-2<br />

6 GEOTECHNICAL CONSIDERATIONS........................................................... 6-1<br />

6.1 Geotechnical and Hydrogeological Issues............................................... 6-1<br />

6.1.1 Surficial Overburden Deposits..................................................... 6-1