The number of reaming passes that will be determined by the hardness of the<br />
material being reamed and the ability to remove cuttings from the hole.<br />
8.6 Testing<br />
As noted in Section 3.4.4, the pipe string is often hydrostatically pretested prior to<br />
pull back. This segment of pipe is then also tested as part of the mainline pressure<br />
test. Pretesting and testing of the installed pipe upon completion of the drill<br />
should follow CAPP’s 1996 Guidelines <strong>for</strong> Hydrostatic Test Water Management.<br />