13.01.2013 Views

DELIVERY PROGRAM HEAVY PLATE - Dillinger Hütte GTS

DELIVERY PROGRAM HEAVY PLATE - Dillinger Hütte GTS

DELIVERY PROGRAM HEAVY PLATE - Dillinger Hütte GTS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

XXXXXX Integrated Management System (IMS)<br />

Inspection certificates according to EN 10204<br />

Type Designation Content Confirmation of<br />

certification by<br />

2.1 Certificate of<br />

Compliance<br />

2.2 Analysis<br />

Certificate*<br />

2.2 Test Report<br />

26<br />

Confirmation of<br />

accordance with the order<br />

Confirmation of<br />

accordance with the order,<br />

stating the results of<br />

non-specific inspection<br />

3.1 Acceptance<br />

Certificate 3.1 Confirmation of<br />

accordance with the order,<br />

stating the results of<br />

3.2 Acceptance<br />

Certificate 3.2<br />

* <strong>Dillinger</strong> <strong>Hütte</strong> <strong>GTS</strong> designation<br />

only with statement of heat analysis<br />

specific inspection<br />

the producer / the<br />

producer‘s acceptance<br />

inspector<br />

the producer / the<br />

producer‘s acceptance<br />

inspector<br />

the producer‘s acceptance<br />

inspector, who is independent<br />

of the production<br />

department<br />

the producer's acceptance<br />

inspector, who is independent<br />

of the production<br />

department, and the<br />

acceptance inspector<br />

commission ed by the<br />

customer or the acceptance<br />

inspector specified in the<br />

official regulations/<br />

standards

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!