13.01.2013 Views

Strategic Projects along the Waterfront - City of Greater Geelong

Strategic Projects along the Waterfront - City of Greater Geelong

Strategic Projects along the Waterfront - City of Greater Geelong

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

E. Youth Activities Area and Childrens Playground<br />

A steep, planted embankment separates <strong>the</strong> Baywalk from <strong>the</strong> Youth Activities<br />

Area. The steepness <strong>of</strong> <strong>the</strong> bank has led to some erosion and <strong>the</strong> failed<br />

planting requires fur<strong>the</strong>r consideration.<br />

The Children’s Playground complements <strong>the</strong> Youth Activities Area and<br />

encourages family use <strong>of</strong> <strong>the</strong> zone. A grassed area separates <strong>the</strong> playground<br />

and <strong>the</strong> Youth Activites Area, providing an appropriate balance between<br />

separation and proximity. Some attention to slope erosion may be required in<br />

<strong>the</strong> playground.<br />

Additional facilities for picnics and barbeques would be desirable while <strong>the</strong><br />

second stage <strong>of</strong> <strong>the</strong> development <strong>of</strong> <strong>the</strong> Youth Activities Area should be<br />

pursued (refer Stategic <strong>Projects</strong>).<br />

E. Youth Activities Area & Children's Playground<br />

Key Recommendations<br />

� Current usage and programming is successful and should be maintained.<br />

� Continue to support youth-based recreation activity and facilities on <strong>the</strong> waterfront including <strong>the</strong> development <strong>of</strong> <strong>the</strong> second stage <strong>of</strong> <strong>the</strong> Youth Activities<br />

Area.<br />

Specifi c Actions<br />

� Address erosion <strong>of</strong> <strong>the</strong> embankment between <strong>the</strong> Youth Activities Area and <strong>the</strong> Baywalk.<br />

� Retain and protect <strong>the</strong> grassed area between <strong>the</strong> children's play area and <strong>the</strong> Youth Activities Area and consider alternative slope retention methods in <strong>the</strong><br />

children's playground to overcome existing erosion problems.<br />

� Investigate <strong>the</strong> provision <strong>of</strong> a free barbeque, picnic and shelter facilities adjacent to <strong>the</strong> Youth Activities Area and playground.<br />

� Install a retaining wall at <strong>the</strong> edge <strong>of</strong> <strong>the</strong> Baywalk which can double as seating, replanting <strong>the</strong> embankment behind <strong>the</strong> retaining wall.<br />

23<br />

Urban Initiatives<br />

WATERFRONT GEELONG MASTERPLAN 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!