<strong>Clayton</strong> <strong>Falls</strong> WUP <strong>Aquatic</strong> Productivity Monitoring Program – Year 1, 2005<br />

Table 2: Sample Site Habitat Description<br />

<strong>Clayton</strong> Creek Reach 2 (2005)<br />

Stream <strong>Clayton</strong> Creek Site CF1 Reach 2<br />

<strong>Water</strong>shed Code 160-466100-08200-87300 Date Sept. 13-05 Crew FK/RP/HW/AJ<br />

Hydraulic Type Cascade MSTM or SD Chan MS Map Gradient NA<br />

Field gradient 4% Sample Width 7.5 m Stream Width 14.0m<br />

Channel Width 20.0 m Mean Depth 0.40 m Max. Depth 0.80 m<br />

Mean Velocity 0.12 m/s Max. Velocity 0.38 m/s Temperature 9.2 C<br />

Stream Stage M Turbidity/Visibility 1.5 m Time 10:54 h<br />

Cover Components %<br />

LWD Boulder In. Veg Over Veg. Cutbank<br />

0 5 0 0 0<br />

Substrate Distribution %<br />

Fines<br />

Small<br />

Gravel<br />

Large Gravel Cobble Boulder Bedrock Sand<br />

0 15 10 30 40 0 5<br />

Substrate<br />

Compaction<br />

Comments<br />

M D90 50 cm Dmax 200 cm Conductivity 22.0 µS/cm<br />

Pink and chum salmon spawners noted at site.<br />

Site 15 m long x 7.5 m wide (112.5 m 2 ), Discharge 0.49 m 3 /s for 9.1 m width assessed<br />

Site CF2 was located in Reach 3, approximately 5 m upstream from the head pond (Figure 1).<br />

The site was approximately 96.2 m 2 and exhibited similar boulder boulder-cascade stream<br />

morphology as noted in Reach 3. Substrate and stream habitat covers were also similar to<br />

Reach 2, providing predominantly boulder and cobble habitat cover. Stream width was<br />

approximately 17m at site CF2, with a maximum depth of 1.20 m and mean depth of 0.30 m<br />

observed on September 13. Maximum velocity was measured as 0.77 m/s and mean velocity<br />

was 0.54 m/s.<br />

Discharge at Site CF2 was calculated from data collected at seven points across a<br />

representative site transect, extending approximately 6 m into the stream channel. Stream<br />

depth and swift velocity precluded field crew ability to collect stream discharge data across the<br />

entire stream channel. Discharge at Site CF2 was determined to be 1.11 m 3 /s based on<br />

measurements made September 13, 2006.<br />

Sites CF1 and CF2 both exhibited similar conductivity (22.0 µS/cm) and approximately similar<br />

stream temperatures (9.2°C at Site CF1 and 9.5°C at Site CF2).<br />

Kynoch Resources<br />

7