Clayton Falls Project Water Use Plan Aquatic - BC Hydro
Clayton Falls Project Water Use Plan Aquatic - BC Hydro
Clayton Falls Project Water Use Plan Aquatic - BC Hydro
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Clayton</strong> <strong>Falls</strong> WUP <strong>Aquatic</strong> Productivity Monitoring Program – Year 1, 2005<br />
Table 2: Sample Site Habitat Description<br />
<strong>Clayton</strong> Creek Reach 2 (2005)<br />
Stream <strong>Clayton</strong> Creek Site CF1 Reach 2<br />
<strong>Water</strong>shed Code 160-466100-08200-87300 Date Sept. 13-05 Crew FK/RP/HW/AJ<br />
Hydraulic Type Cascade MSTM or SD Chan MS Map Gradient NA<br />
Field gradient 4% Sample Width 7.5 m Stream Width 14.0m<br />
Channel Width 20.0 m Mean Depth 0.40 m Max. Depth 0.80 m<br />
Mean Velocity 0.12 m/s Max. Velocity 0.38 m/s Temperature 9.2 C<br />
Stream Stage M Turbidity/Visibility 1.5 m Time 10:54 h<br />
Cover Components %<br />
LWD Boulder In. Veg Over Veg. Cutbank<br />
0 5 0 0 0<br />
Substrate Distribution %<br />
Fines<br />
Small<br />
Gravel<br />
Large Gravel Cobble Boulder Bedrock Sand<br />
0 15 10 30 40 0 5<br />
Substrate<br />
Compaction<br />
Comments<br />
M D90 50 cm Dmax 200 cm Conductivity 22.0 µS/cm<br />
Pink and chum salmon spawners noted at site.<br />
Site 15 m long x 7.5 m wide (112.5 m 2 ), Discharge 0.49 m 3 /s for 9.1 m width assessed<br />
Site CF2 was located in Reach 3, approximately 5 m upstream from the head pond (Figure 1).<br />
The site was approximately 96.2 m 2 and exhibited similar boulder boulder-cascade stream<br />
morphology as noted in Reach 3. Substrate and stream habitat covers were also similar to<br />
Reach 2, providing predominantly boulder and cobble habitat cover. Stream width was<br />
approximately 17m at site CF2, with a maximum depth of 1.20 m and mean depth of 0.30 m<br />
observed on September 13. Maximum velocity was measured as 0.77 m/s and mean velocity<br />
was 0.54 m/s.<br />
Discharge at Site CF2 was calculated from data collected at seven points across a<br />
representative site transect, extending approximately 6 m into the stream channel. Stream<br />
depth and swift velocity precluded field crew ability to collect stream discharge data across the<br />
entire stream channel. Discharge at Site CF2 was determined to be 1.11 m 3 /s based on<br />
measurements made September 13, 2006.<br />
Sites CF1 and CF2 both exhibited similar conductivity (22.0 µS/cm) and approximately similar<br />
stream temperatures (9.2°C at Site CF1 and 9.5°C at Site CF2).<br />
Kynoch Resources<br />
7