17.01.2013 Views

Conductix-Wampfler Cables for Reeling Systems

Conductix-Wampfler Cables for Reeling Systems

Conductix-Wampfler Cables for Reeling Systems

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

68<br />

Installation guidelines<br />

Strain relief<br />

A moving reel cable should never be<br />

operated without sufficient tension relief.<br />

During winding, the strands should<br />

be able to move slightly within the<br />

cable in order to ensure compensation<br />

of length around the neutral strands.<br />

Correctly implemented tension relief<br />

will significantly lengthen the service<br />

life of the cable.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

Cable<br />

Entry funnel with tension relief<br />

Tension relief drum<br />

Two full windings<br />

Cable clamp<br />

Connection boxes<br />

Connector cable<br />

Drainage<br />

Another options <strong>for</strong> tension relief is in<br />

the use of cable mesh grips, which<br />

avoid point stresses on the strands in<br />

their stranding bundles. The correct<br />

cable mesh grip is selected according<br />

<strong>Conductix</strong>-<strong>Wampfler</strong> offers different<br />

systems <strong>for</strong> effective tension relief.<br />

Both central and end feeds should ideally<br />

use tension relief drums (whether<br />

underground or above ground).<br />

Here, it should particularly be ensured<br />

that the tension relief drums comply<br />

with the minimum bending radius Rmin<br />

of the cable and that relief segments<br />

Amin are provided. (see tables)<br />

1 2 3 2 4<br />

8<br />

Rmin<br />

Rmin<br />

Amin<br />

5 6 7<br />

5<br />

to the cable diameter. A cable mesh grip<br />

with an eye is the standard variant. (1)<br />

For vertical applications with higher tension<br />

<strong>for</strong>ces or if central feed is in use,<br />

the use of cable mesh grips with two<br />

1 2 3.1 3.2 schematic diagrams!<br />

An optimum, <strong>for</strong>ce-fit installation of<br />

tension relief is only ensured when at<br />

least two full windings are in place on<br />

the motorized cable reel and on the<br />

tension relief drum!<br />

eyes is recommended, since these can<br />

support the <strong>for</strong>ces better due to their<br />

symmetrical arrangement. (2)<br />

For impacts or extreme tension <strong>for</strong>ces<br />

(<strong>for</strong> example, spreader applications),<br />

systems with tension relief springs (3.1)<br />

or bundles of rubber ropes (3.2) are<br />

used.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!