17.01.2013 Views

The Air Navigation System Plan - Nav Canada

The Air Navigation System Plan - Nav Canada

The Air Navigation System Plan - Nav Canada

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4<br />

PBN Timeframe<br />

PERFORMANCE BASED NAVIGATION (PBN)<br />

Implementation will be based on priorities that are cognizant of regulations (current and future) as well as customer requirements<br />

and capabilities. <strong>The</strong> requirement is for a total system capability to enable an air operation and, therefore, implementation will be<br />

aligned with advancements in communications (DCPC, CPDLC), surveillance (ADS-B, WAM) and <strong>Air</strong> Traffic Management. PBN<br />

implementation projects, including WTM and AASP, will need to meet stakeholder requirements and a viable business case.<br />

NAV CANADA<br />

capable of<br />

designing RNP<br />

procedures<br />

B0-65*<br />

WAAS deployed in<br />

2007 and LPV service<br />

available<br />

B0-65*<br />

ILS Replacement<br />

Project completed<br />

with LOC (BC)<br />

procedures replaced<br />

with RNAV<br />

Selected<br />

DND TACANs<br />

replaced with DMEs<br />

RF legs<br />

incorporated<br />

into STARS<br />

B0-05*<br />

B0-10*<br />

B0-65*<br />

PBN<br />

GBAS<br />

WAAS<br />

ILS<br />

DME<br />

NDB<br />

VOR<br />

Conduct GBAS<br />

evaluations<br />

B0-65*<br />

RNP AR<br />

procedures<br />

introduced<br />

B0-65*<br />

AIR NAVIGATION SYSTEM PLAN 2012<br />

CMNPS and RNPC<br />

airspace converted to<br />

PBN specifications<br />

B0-05*<br />

B0-10*<br />

B0-65*<br />

SHORT-TERM<br />

NEAR-TERM<br />

2012 2013 2014 2015 – 2019<br />

<strong>The</strong> application of PBN tools<br />

NDB drawdown<br />

completed<br />

Note: * See explanation of mapping to ICAO Aviation <strong>System</strong> Block Upgrades on page 1.<br />

NAV CANADA supports<br />

the extension of<br />

the US WAAS into<br />

Canadian airspace<br />

to approximately 70<br />

degrees north. This<br />

service supports our<br />

application of LPV<br />

approaches and further<br />

work in the short-term is<br />

expected to result in the<br />

ability to conduct LPV<br />

approaches to a 200<br />

foot DA. WAAS supports<br />

high integrity positioning<br />

supporting RNP and<br />

surveillance applications.<br />

Acronym Table<br />

AASP Alberta <strong>Air</strong>space and Services<br />

Project<br />

ADS-B Automatic Dependent<br />

Surveillance -Broadcast<br />

AIS Aeronautical Information<br />

Services<br />

CCO Continuous Climb Operations<br />

CDO Continuous Descent Operations<br />

CMNPS Canadian Minimum <strong><strong>Nav</strong>igation</strong><br />

Performance Specifications<br />

CPDLC Controller-Pilot Data Link<br />

Communications<br />

DA Decision Altitude<br />

DME Distance Measuring Equipment<br />

DCPC Direct Controller-Pilot<br />

Communications<br />

GBAS Ground Based Augmentation<br />

<strong>System</strong><br />

ILS Instrument Landing <strong>System</strong><br />

LNAV Lateral <strong><strong>Nav</strong>igation</strong><br />

LOC(BC) Localizer (Back Course)<br />

LOS Level of Service<br />

LPV Localizer Performance with<br />

Vertical Guidance<br />

NDB Non-Directional Beacon<br />

RF Radius to Fix<br />

RNAV Area <strong><strong>Nav</strong>igation</strong><br />

RNP Required <strong><strong>Nav</strong>igation</strong><br />

Performance<br />

RNP AR Required <strong><strong>Nav</strong>igation</strong><br />

Performance<br />

Authorization Required<br />

RNPC Required <strong><strong>Nav</strong>igation</strong><br />

Performance Capability<br />

SARPs Satndards and Recommended<br />

Practices<br />

VOR drawdown<br />

completed<br />

Low Level airspace<br />

restructuring<br />

opportunities<br />

B0-10*<br />

<strong>The</strong> PBN<br />

TOOLBOX<br />

RNP<br />

RNAV<br />

LPV<br />

VNAV<br />

LNAV<br />

GBAS<br />

SBAS<br />

CDO<br />

CCO<br />

SIDS<br />

STARS<br />

SBAS* Satellite Based Augmentation<br />

<strong>System</strong><br />

SIDS Standard Instrument Departures<br />

STARS Standard Arrival Routes<br />

TBOs Trajectory-Based Operations<br />

VNAV Vertical <strong><strong>Nav</strong>igation</strong><br />

VOR Very high frequency<br />

Omnidirectional Range<br />

WAAS* Wide Area Augmentation<br />

<strong>System</strong><br />

WAM Wide Area Multilateration<br />

WTM Windsor/Toronto/Montreal<br />

<strong>Air</strong>space and Services Review<br />

* WAAS is the North American version of the<br />

generic SBAS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!