20.01.2013 Views

Instruction Manual and Maintenance Tips for your dwt ... - dwt-Zelte

Instruction Manual and Maintenance Tips for your dwt ... - dwt-Zelte

Instruction Manual and Maintenance Tips for your dwt ... - dwt-Zelte

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

050139_<strong>dwt</strong>_Au bau_GB 10.10.2005 08:50 Uhr Seite 5<br />

Left or right partial awnings<br />

� Pull the awning roof in the piping profile <strong>and</strong> start<br />

at the rear with a left partial awning at the front with a right partial awning<br />

The wall eyelet fixing point <strong>for</strong> a partial awning is on the awning side (C), 10 cm above the side roof<br />

seam. The vertical wall has a pole pocket. Here you can fix a wall eyelet at position (D) on the<br />

caravan, 2 cm underneath the piping profile.<br />

� Now measure from eyelet C on the awning side, horizontal as described, to the wall<br />

eyelet D. fix the middle eyelet exactly in the middle between these points, 2 cm<br />

underneath the piping profile F.<br />

from the left <strong>for</strong> a left partial awning from the right <strong>for</strong> a right partial awning.<br />

Our Tip:<br />

� Seal the drilled holes to keep moisture out. Your specialist supplier will be glad to advice you!<br />

� A very practical alternative to wall eyelets are the vario-clip elements, that you<br />

can easily click on to the second roof profile <strong>and</strong> save you a lot of assembly work.<br />

The vario-clip elements are 100% stable <strong>and</strong> reusable. Ask <strong>your</strong> specialist<br />

supplier!<br />

�<br />

�<br />

�<br />

C<br />

C<br />

F<br />

D<br />

F<br />

D<br />

D<br />

C<br />

MEIN ZELT ! 4–5<br />

GB

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!