29.01.2013 Views

2011 Excellence In Construction Awards - Central Florida Chapter ...

2011 Excellence In Construction Awards - Central Florida Chapter ...

2011 Excellence In Construction Awards - Central Florida Chapter ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

David Maus Collision Center, Sanford<br />

Architect – Zenner Group<br />

N RL Haines General Contractor<br />

C Commercial, $1–$5 million<br />

T Phil Smith, David Boone and Landy Bolli<br />

A Award of Merit<br />

RL Haines constructed the new 47,000 square foot David Maus Collision Center as<br />

an addition to the existing Toyota dealership. Working around the 100+ employees<br />

operating out of David Maus Toyota required careful staging and traffic plans from<br />

the RL Haines project management team. <strong>In</strong>side the customer lounge and offices,<br />

high–end finishes are used throughout. <strong>In</strong> the shop, extra precautions for climate<br />

control were installed for exhausting the four paint booth ovens. The site work and<br />

site lightening occurred underneath the easement of high–tension power lines,<br />

requiring on–site supervision to maintain the highest–level of quality control.<br />

Eastern Water Reclamation Facility Phase IV–C,<br />

Orange County, FL<br />

Engineer – Boyle Engineering Corporation<br />

N Wharton-Smith, <strong>In</strong>c.<br />

C Public Works/Environmental, $20–$50 million<br />

T Erik Anderson, William McMullen, Brett Wilson and Jeanni Perry<br />

A Eagle Award<br />

The Eastern Water Reclamation facility is critical to the community it serves,<br />

processing in excess of twenty million gallons of wastewater each day, escalating<br />

to over 40 million gallons per day at its peak. Through this expansion the residents<br />

of Eastern Orange County receive the highest level of service from the plant. The<br />

effluent reclaimed water is utilized at the Stanton Energy Plant located south of the<br />

facility. The reclaimed water is used to provide cooling water for the plant, which<br />

puts much less stress on the local eco–system.<br />

THANK YOU<br />

to our project teams, all subcontractors, and the architects<br />

that contributed to the following Eagle award-winning projects:<br />

Orlando <strong>In</strong>ternational Airport, BP-X019 <strong>In</strong>-Line Baggage Screening System, Phase C<br />

GEICO Garage<br />

DELIVERING construction excellence<br />

PCL <strong>Construction</strong> Services, <strong>In</strong>c. | 6675 Westwood Boulevard, Suite 200 | Orlando, <strong>Florida</strong> 32821 | P: 407.363.0059 | pcl.com<br />

<strong>2011</strong> EIC <strong>Awards</strong> 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!