Construction of the Luton Dunstable Guided Busway
Construction of the Luton Dunstable Guided Busway
Construction of the Luton Dunstable Guided Busway
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
To Achieve this we will need to:<br />
• Remodel and improve 9 Highway Junction/Intersections<br />
(Includes Bridge to At-Grade Conversions)<br />
• Construct 4 Bus Stops along <strong>the</strong> route<br />
• Build a new Station Drop-<strong>of</strong>f access and turning area<br />
• Construct a new Bus Interchange at <strong>the</strong> Station.<br />
• Manufacture 4520No precast concrete beams,<br />
• and 2601 No precast concrete pads.