Contract Details<br />
• NEC3 Option C Target Cost with Activity Schedule<br />
• Principal Contractor – BAM Nuttall Ltd.<br />
• Design & Construct Scheme<br />
• Design Partner – Joint Venture between ARUP and PB<br />
• <strong>Construction</strong> by BAM Nuttall Ltd (+ Specialist<br />
Subcontractors)<br />
Currently in Final <strong>Construction</strong> Phase leading into<br />
commissioning<br />
• Duration 35 Months<br />
• Starting Date June 2010<br />
• Completion Date April 2013