Construction of the Luton Dunstable Guided Busway

Construction of the Luton Dunstable Guided Busway

Construction of the Luton Dunstable Guided Busway

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contract Details<br />

• NEC3 Option C Target Cost with Activity Schedule<br />

• Principal Contractor – BAM Nuttall Ltd.<br />

• Design & Construct Scheme<br />

• Design Partner – Joint Venture between ARUP and PB<br />

• <strong>Construction</strong> by BAM Nuttall Ltd (+ Specialist<br />

Subcontractors)<br />

Currently in Final <strong>Construction</strong> Phase leading into<br />

commissioning<br />

• Duration 35 Months<br />

• Starting Date June 2010<br />

• Completion Date April 2013