30.01.2013 Views

19 DER Technical Requirements for Interconnection in Germany

19 DER Technical Requirements for Interconnection in Germany

19 DER Technical Requirements for Interconnection in Germany

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Overview | Exist<strong>in</strong>g requirements <strong>in</strong> <strong>Germany</strong> | Upcom<strong>in</strong>g codes on the European level | Summary | Resources | Contact<br />

Contact <strong>in</strong><strong>for</strong>mation<br />

> Dipl.-Ing. Hannes Knopf, M.Sc.<br />

Director, International Product Management<br />

SMA Solar Technology AG<br />

Sonnenallee 1<br />

34266 Niestetal, <strong>Germany</strong><br />

Tel. +49 561 9522-3379<br />

Hannes.Knopf@SMA.de<br />

www.SMA.de<br />

> Dipl.-Ing. Sönke Christian Rogalla<br />

Head of Group Central Inverters and Solar Power Plants Dept. Electrical Energy Systems<br />

Fraunhofer-Institut für Solare Energiesysteme ISE<br />

Heidenhofstrasse 2<br />

79110 Freiburg, <strong>Germany</strong><br />

Tel. +49 761 4588-5454<br />

Soenke.Rogalla@ise.fraunhofer.de<br />

www.ise.fraunhofer.de<br />

SMA Solar Technology AG<br />

18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!