30.01.2013 Views

19 DER Technical Requirements for Interconnection in Germany

19 DER Technical Requirements for Interconnection in Germany

19 DER Technical Requirements for Interconnection in Germany

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Overview | Exist<strong>in</strong>g requirements <strong>in</strong> <strong>Germany</strong> | Upcom<strong>in</strong>g codes on the European level | Summary<br />

Exist<strong>in</strong>g requirements <strong>in</strong> <strong>Germany</strong><br />

BDEW <strong>Technical</strong> Guidel<strong>in</strong>e Generat<strong>in</strong>g Plants Connected to the Medium-Voltage Network<br />

Lessons learned (from a manufacturer's and test <strong>in</strong>stitute’s perspective)<br />

Suggestions <strong>for</strong> the improvement of the process <strong>for</strong> the creation of new codes:<br />

> all stakeholders (TCOs, DSOs, utilities, manufacturers, certify<strong>in</strong>g bodies, test <strong>in</strong>stitutes, project<br />

SMA Solar Technology AG<br />

developers, …) should be <strong>in</strong>cluded <strong>in</strong> an early stage to pay tribute<br />

to significant differences <strong>in</strong> technologies (w<strong>in</strong>d, PV, … , transmission, distribution, …)<br />

> <strong>in</strong>clude references to <strong>in</strong>ternational standards (and push <strong>for</strong> their update!)<br />

to avoid parallel or even conflict<strong>in</strong>g requirements<br />

> def<strong>in</strong>ition of reasonable transitional periods<br />

> <strong>for</strong> the implementation of new requirements <strong>in</strong>to new and exist<strong>in</strong>g product l<strong>in</strong>es<br />

be aware: retroactive requirements <strong>for</strong> exist<strong>in</strong>g equipment carry a high cost factor<br />

> <strong>for</strong> the def<strong>in</strong>ition and implementation of the necessary <strong>in</strong>frastructure and processes<br />

e.g. <strong>for</strong> type test<strong>in</strong>g and certification<br />

> to allow <strong>for</strong> tra<strong>in</strong><strong>in</strong>g of affected parties (project developers, utilities, …)<br />

Knopf/Rogalla, April 12, 2012, EPRI/PJM/NREL workshop, PJM <strong>Interconnection</strong>, Norristown, PA<br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!