30.01.2013 Views

19 DER Technical Requirements for Interconnection in Germany

19 DER Technical Requirements for Interconnection in Germany

19 DER Technical Requirements for Interconnection in Germany

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Overview | Exist<strong>in</strong>g requirements <strong>in</strong> <strong>Germany</strong> | Upcom<strong>in</strong>g codes on the European level | Summary<br />

Exist<strong>in</strong>g requirements <strong>in</strong> <strong>Germany</strong><br />

BDEW <strong>Technical</strong> Guidel<strong>in</strong>e Generat<strong>in</strong>g Plants Connected to the Medium-Voltage Network<br />

background and history:<br />

> draft and publication by the German association of grid operators (BDEW)<br />

> consultation of PV-<strong>in</strong>dustry as ”junior partners”<br />

> additional transitional periods had to be def<strong>in</strong>ed<br />

<strong>in</strong> three amendments<br />

SMA Solar Technology AG<br />

Knopf/Rogalla, April 12, 2012, EPRI/PJM/NREL workshop, PJM <strong>Interconnection</strong>, Norristown, PA<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!