01.02.2013 Views

1321 - Office of Legacy Management - U.S. Department of Energy

1321 - Office of Legacy Management - U.S. Department of Energy

1321 - Office of Legacy Management - U.S. Department of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

- <strong>1321</strong><br />

Rcmcdiakgn Package<br />

FDF Subcontract No. 98SC000001<br />

IT Project No. 773481 Issue Date: 213198 Rw.B<br />

\<br />

e<br />

e<br />

e<br />

e<br />

e<br />

e<br />

e<br />

e<br />

e<br />

e<br />

e<br />

e<br />

e<br />

e<br />

Overall excavation sequence and method<br />

Criteria and assumptions (including slope stability and bearing capacity <strong>of</strong> the waste<br />

material)<br />

Pr<strong>of</strong>iles, sections, and details <strong>of</strong> the pits as they currently exist<br />

Material handling considerations, including considerations specific to the handling <strong>of</strong><br />

nontypical wastes<br />

Discussion <strong>of</strong> pit dewatering<br />

Leachate and storm water run-odrun<strong>of</strong>f management and approach to minimize<br />

leachate infiltration to the aquifer<br />

Excavation sequencing and processes to be used in the excavation <strong>of</strong> individual waste<br />

pits including plans and sections<br />

Manpower requirements and equipment selection for waste excavation and transport<br />

Proposed stockpile areas for potential blending and segregation<br />

Debris management and segregation<br />

Air monitoring (specific sampling and analysis details are given in the Sampling and<br />

Analysis Plan which is not part <strong>of</strong> this package)<br />

Dust and fugitive emissions controls<br />

Equipment decontamination facilities and procedures<br />

Interim and final grading.<br />

5.2 Preoperational Schedule<br />

The schedule identifies major activity elements and milestones, fiom WRAP contract award to<br />

Initiation <strong>of</strong> Operations.<br />

KN/3957/WPRAPffil .B/Q2-19-98(441 pa~ywME 4<br />

000018<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

31<br />

32<br />

33<br />

34<br />

35<br />

36<br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!