I<br />

CI- -<br />

<strong>1321</strong><br />

FDF Subcontract No. 98SCOOOOO1 Desaiption <strong>of</strong> Operation & PnnxSs<br />

IT Project No. 77348 1 Isnre Date: 2/13/98 Rev. B<br />

railcar siding fiom contamination in the event <strong>of</strong> spillage during the loadout operation. Once the 1<br />

loadout is complete, the liner is folded over the waste and secured.<br />

2.7.1 Railcar Loadout and Lidding Operations<br />

These operations involve moving four railcars at a time utilizing a track mobile. The railcars will<br />

enter the loadout building at the northeast comer (through the rail decon area). For discussion<br />

purposes, the first car that enters the building is referred to as Car 4, with all cars that follow<br />

being referred to in a descending numerical order because the last car to enter the building will be<br />

the first car to leave the building. Each car will proceed through five operations necessary for<br />

completion <strong>of</strong> loadout. These operations include:<br />

.<br />

0 Lid removal and inspection<br />

0 Railcarlining<br />

Loadout<br />

Lidding and decontamination<br />

0 Radiological survey.<br />

The following is a step-by-step description <strong>of</strong> the operation in the Railcar Loadout Building: 18<br />

Step 1. As the railcars pass through the decontamination area, the lids will be removed and 20<br />

visually inspected to assess their condition and to identify any damages. 21<br />

If the lid is in good condition, it will be placed in a rack located within the decon 23<br />

area and stackedstored until the lid replacement step, after railcar loadout is 24<br />

completed. 25<br />

If a lid requires repair, it will be placed back on Car 1. The railcars then move to<br />

the liner and lid repair area at the southem end <strong>of</strong> the building where damaged lids<br />

will be removed as needed for repair. - 29<br />

Step 2. Once all <strong>of</strong> the lids are removed, either in the decon area or the liner and lid repair area,<br />

the cars will be moved to the liner and lid repair area. Car 1 is positioned in the lining area and<br />

lined, with Cars 2,3, and 4 awaiting lining.<br />

Step 3. The cars will advance so that Car 1 is awaiting loadout,* 2 is being lined, and Cars 3 35<br />

and 4 are awaiting lining. 36<br />

KN/39571WPRAP/EVEZ.W-20-98(909 EIII~DIINE 13<br />

000046<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

19<br />

22<br />

26<br />

27<br />

28<br />

30<br />

31<br />

32<br />

33<br />

34<br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!