DETERMINE SEQUENCE, ENHANCE CAPACITY:<br />

G.I.B DISPO-COCKPIT PLANNING FOR PRODUCTION PLANNING<br />

Normally, plann<strong>in</strong>g-relevant capacities<br />

belong to different production and<br />

responsibility areas. Accord<strong>in</strong>gly, <strong>in</strong><br />

G.I.B <strong>Dispo</strong>-<strong>Cockpit</strong> Plann<strong>in</strong>g production<br />

areas are divided <strong>in</strong>to plann<strong>in</strong>g and<br />

<strong>in</strong>formation areas which at the same time<br />

represent the basis for the subsequent<br />

WIP determ<strong>in</strong>ation.<br />

With G.I.B <strong>Dispo</strong>-<strong>Cockpit</strong> Plann<strong>in</strong>g you<br />

will obta<strong>in</strong> a tabular plann<strong>in</strong>g table for<br />

an optimum capacity plann<strong>in</strong>g and<br />

sequenc<strong>in</strong>g of production, process and<br />

planned orders or of run schedule quantities<br />

<strong>in</strong> the field of repetitive manufactur<strong>in</strong>g.<br />

By drag and drop, orders which<br />

have not yet been scheduled can be<br />

scheduled <strong>in</strong> a simulation mode and<br />

checked for feasibility with<strong>in</strong> a graphical<br />

display of the capacity situation before<br />

conversion. Necessary capacity adjustments<br />

because of breakdowns, company<br />

vacation or extra shifts can be realized<br />

<strong>in</strong> a fast and easy way.<br />

The <strong>in</strong>tegration of classic application<br />

functions concern<strong>in</strong>g the process<strong>in</strong>g of<br />

production, process and planned orders<br />

is available as well. Without any problems<br />

topics such as conversion, release<br />

and pr<strong>in</strong>t of planned orders, schedul<strong>in</strong>g,<br />

confirmation, exception messages, miss-<br />

<strong>in</strong>g parts situations, global availability,<br />

COGI process<strong>in</strong>g etc. can be detected,<br />

utilized and handled. Because of the<br />

<strong>in</strong>tegration <strong>in</strong>to the <strong>SAP</strong> system data will<br />

always be up-to-date and onl<strong>in</strong>e.<br />

Many companies are fac<strong>in</strong>g the major<br />

challenge of WIP and its periodic determ<strong>in</strong>ation.<br />

With G.I.B <strong>Dispo</strong>-<strong>Cockpit</strong><br />

Plann<strong>in</strong>g cost surveys and cost analyses<br />

<strong>in</strong>clud<strong>in</strong>g target/actual comparisons can<br />

be created and transferred to different<br />

WIP analyses <strong>in</strong>clud<strong>in</strong>g history and trend<br />

at the level of hierarchy nodes.