02.02.2013 Views

G.I.B Dispo-Cockpit Optimizing Logistic Processes in SAP

G.I.B Dispo-Cockpit Optimizing Logistic Processes in SAP

G.I.B Dispo-Cockpit Optimizing Logistic Processes in SAP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

18<br />

With G.I.B <strong>Dispo</strong>-<strong>Cockpit</strong> Plann<strong>in</strong>g you will obta<strong>in</strong><br />

a tabular plann<strong>in</strong>g table for an optimum capacity<br />

plann<strong>in</strong>g and sequenc<strong>in</strong>g of production, process<br />

and planned orders or of run schedule quantities <strong>in</strong><br />

the field of repetitive manufactur<strong>in</strong>g.<br />

The <strong>in</strong>tegration of classic application functions<br />

concern<strong>in</strong>g the process<strong>in</strong>g of production, process<br />

and planned orders is provided as well.<br />

WIP and its periodic determ<strong>in</strong>ation: With G.I.B<br />

<strong>Dispo</strong>-<strong>Cockpit</strong> Plann<strong>in</strong>g cost surveys and cost analyses<br />

<strong>in</strong>clud<strong>in</strong>g target/actual comparisons can be<br />

created and transferred to different WIP analyses<br />

<strong>in</strong>clud<strong>in</strong>g history and trend at the level of hierarchy<br />

nodes.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!