expert opinion: - OPERC - Off-highway Plant and Equipment ...
expert opinion: - OPERC - Off-highway Plant and Equipment ...
expert opinion: - OPERC - Off-highway Plant and Equipment ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
NEwS<br />
cg Power solutions uk chooses Tarmac secures...<br />
hewden for major projects<br />
In the latest phase of<br />
a growing relationship,<br />
CG Power Solutions UK<br />
has selected Hewden<br />
to provide plant <strong>and</strong><br />
equipment hire plus<br />
site support for a<br />
number of major power<br />
installation contracts.<br />
In Phase 1 of the London Gateway<br />
port development by DP World, CG<br />
Power Solutions will be responsible<br />
for the Coryton Tee-off, taking power<br />
from the nearby Coryton power<br />
station, which primarily feeds Coryton<br />
refinery, <strong>and</strong> delivering the power<br />
to the groundworks site for the new<br />
container port terminal. Construction is<br />
now underway, with dredging <strong>and</strong> new<br />
l<strong>and</strong> creation taking place alongside<br />
the development of key infrastructure.<br />
Situated on the north bank of the River<br />
Thames, London Gateway provides<br />
unrivalled deep-sea shipping access<br />
<strong>and</strong> will ensure ships load <strong>and</strong> unload<br />
as fast as possible. The port will<br />
be the most efficient in the country,<br />
adding an additional 3.5million TEU<br />
(st<strong>and</strong>ard twenty foot equivalent cargo<br />
units (containers)) to the nation’s<br />
port capacity. In addition to a major<br />
deep-sea port, London Gateway will<br />
10<br />
June 2011<br />
integrate with Europe’s largest logistics<br />
park <strong>and</strong> will offer units up to <strong>and</strong> in<br />
excess of one million square feet.<br />
Already on site, CG Power<br />
Solutions Sales Director, Mr<br />
Charles Birchall commented:<br />
“We will be making full use of our in<br />
house design <strong>and</strong> assembly facilities,<br />
as well as project managing critical sub<br />
systems <strong>and</strong> other suppliers. This is one<br />
of the largest power delivery projects<br />
currently running in the South East <strong>and</strong><br />
we are delighted to have been selected.”<br />
“To deliver on time, we will need the<br />
full support of partnership suppliers<br />
like Hewden who underst<strong>and</strong> the<br />
timescales <strong>and</strong> the vital importance of<br />
health <strong>and</strong> safety on these projects.”<br />
In addition to the London Gateway<br />
project, CG Power Solutions has<br />
appointed Hewden to provide<br />
plant hire <strong>and</strong> crane hire support<br />
for all wind farm projects.<br />
These projects involve Hewden<br />
carrying out a series of difficult<br />
lifting operations for the associated<br />
package sub stations. The lifting<br />
involves the positioning of each of the<br />
units at the base of each turbine.<br />
“everyone’s talking about it!”<br />
Commenting on these projects, a<br />
Hewden spokesperson said: “CG<br />
Power Solutions is a fast growing<br />
<strong>and</strong> leading <strong>expert</strong> in transmission<br />
<strong>and</strong> distribution installation projects.<br />
There is a growing relationship with<br />
Hewden <strong>and</strong> we are now supporting<br />
CG on an increasing number of energy<br />
installation projects around the UK.”<br />
CG Power Solutions, formerly known<br />
as Power Technology Solutions,<br />
provides a comprehensive range of<br />
engineering services to blue chip clients<br />
in the UK high voltage electrical power<br />
system industries. These include the<br />
major utilities/Distribution Network<br />
Operators (DNOs), heavy industrial<br />
users, major switchgear manufacturers<br />
<strong>and</strong> ESI approved contractors.