Changing subscriber categories from the<br />
operating centre<br />
trol system ANA 30 by means <strong>of</strong> alarms<br />
and printouts administered by the operation<br />
and maintenance processor,<br />
OMP.<br />
Faults in the switching system can also<br />
be found with the aid <strong>of</strong> ANA 30, since its<br />
printouts show the switching processes<br />
in the form <strong>of</strong> digits and control signals.<br />
Other printouts specify the device<br />
groups that exceed the permitted error<br />
level limits (STU, KS, KM). <strong>The</strong>se printouts<br />
can indicate faults in the switching<br />
system and the network.<br />
After the introduction <strong>of</strong> ANA 30 it has<br />
also been possibleto keep the switching<br />
system in better condition than before,<br />
since the latter system has gradually<br />
been adjusted to the exacting signalling<br />
and time conditions that apply for<br />
ANA 30.<br />
In spite <strong>of</strong> the fact that ANA 30 gives detailed<br />
fault information, the supplementary<br />
fault reports from the subscribers<br />
are <strong>of</strong> importance, for example<br />
when there is a fault in the signal reception<br />
from the push-button sets.<br />
Experience from ANA 30 in Arhus<br />
Centrum shows that after a running-in<br />
period the system is very reliable. <strong>The</strong><br />
operational statistics show that the duplication<br />
<strong>of</strong> most <strong>of</strong> the function units in<br />
ANA 30 ensures that large operational<br />
disturbances are to all intents and<br />
purposes eliminated.<br />
Saving in personnel<br />
By the middle <strong>of</strong> 1978 115 000 lines in<br />
the Arhus area were connected to<br />
ARE 11 exchanges with ANA 30. If these<br />
subscribers were to have been served by<br />
ARF 100 instead, 21 technicians would<br />
have been required for the operation<br />
and maintenance <strong>of</strong> the exchanges, not<br />
including the MDF staff.<br />
It is estimated that after the modernization<br />
with ANA 30 the number <strong>of</strong> technicians<br />
required will be reduced to 18, a<br />
saving <strong>of</strong> 3. Furthermore it is expected<br />
that the staff will be kept at this number<br />
during the coming years despite the fact<br />
that the number <strong>of</strong> subscribers is expected<br />
to increase by 8 % annually.<br />
In addition there is a saving <strong>of</strong> 1/2 man<br />
year per year because such administrative<br />
tasks as category changes, route<br />
changes etc. are carried out by means <strong>of</strong><br />
commands.