12.07.2015 Views

Volumen 3 - Tomo 1 - Ministerio de Salud

Volumen 3 - Tomo 1 - Ministerio de Salud

Volumen 3 - Tomo 1 - Ministerio de Salud

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PRESUPUESTO DE LA COLECTORACOLECTORA ES-1 - ALTERNATIVA 5AN° Descripción Unidad Cantidad P. Unitario P. Total( B/. ) ( B/. )1 Tuberías <strong>de</strong> PVC1,1 <strong>de</strong> 8 " Ø m 0 36,00 0,001,2 <strong>de</strong> 10 " Ø m 695 40,00 27.800,001,3 <strong>de</strong> 12 " Ø m 609 70,00 42.630,001,4 <strong>de</strong> 15 " Ø m 0 112,00 0,00sub-total 70.430,002 Tuberías <strong>de</strong> H.A2,1 <strong>de</strong> 18 " Ø m 993 110,00 109.230,002,2 <strong>de</strong> 21 " Ø m 654 121,00 79.134,002,3 <strong>de</strong> 24 " Ø m 657 135,00 88.695,002,4 <strong>de</strong> 30 " Ø m 532 192,00 102.144,002,5 <strong>de</strong> 36 " Ø m 0 243,00 0,002,6 <strong>de</strong> 42 " Ø m 0 305,00 0,002,7 <strong>de</strong> 48 " Ø m 0 423,00 0,002,8 <strong>de</strong> 54 " Ø m 0 525,00 0,002,9 <strong>de</strong> 60 " Ø m 0 592,00 0,002,10 <strong>de</strong> 66 " Ø m 0 0,00 0,002,11 <strong>de</strong> 72 " Ø m 0 860,00 0,002,12 <strong>de</strong> 78 " Ø m 0 0,00 0,00sub-total 379.203,003 Camaras <strong>de</strong> Insp.<strong>de</strong> 0.00 a 1.50 m c/u 0 780,00 0,00<strong>de</strong> 1.51 a 2.00 m c/u 29 945,00 27.405,00<strong>de</strong> 2.01 a 3.00 m c/u 29 955,00 27.695,00<strong>de</strong> 3.01 a 4.00 m c/u 15 1.760,00 26.400,00<strong>de</strong> 4.01 a 5.00 m c/u 2 2.500,00 5.000,00> <strong>de</strong> 5.00 m c/u 2 2.900,00 5.800,00sub-total 92.300,004 Cruces <strong>de</strong> Rios c/u 2 25.000,00 50.000,00sub-total 50.000,005 Imprevisto (10%) 59.193,30TOTALB/.651.126,30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!