Monitoring Plan<br />
The Monitoring Plan basically refers to operations that guarantee that installation operational values are correct. It involves the simple monitoring of<br />
main operating parameters, to verify correct installation operation.<br />
It has the following scope:<br />
Installation<br />
element<br />
Operation<br />
Frequency (Months)<br />
Description<br />
COLLECTORS<br />
Clean cover<br />
Cober<br />
Joints<br />
Absorber<br />
Structure<br />
Conenections<br />
To be decided<br />
3<br />
3<br />
3<br />
3<br />
3<br />
With water and suitable products<br />
**Condensation in middle of the day<br />
**Cracks and deformations.<br />
**Corrosion, deformation, leaks, etc.<br />
**Leaks<br />
**Degradation, signs of corrosion<br />
PRIMARY CIRCUIT<br />
Piping, insulation and<br />
filling system<br />
6<br />
**Absence of humidity and leaks<br />
SECONDARY<br />
CICRUICT<br />
Leak tightness of fittings<br />
and valves at collector inlet<br />
and outlet<br />
3<br />
**Leaks<br />
** visual inspection<br />
In the case of failure contact your installer or qualified professional<br />
15.2 Maintenance plan<br />
. Maintenance involves a revision at least annually.<br />
. The maintenance plan must be performed by competent technical personnel familiar with thermal solar technology and mechanical<br />
installations in general. The installation must have a maintenance book containing all operations carried out in addition to corrective<br />
maintenance.<br />
. The following is a detailed list of maintenance operations to be carried out.<br />
Maintenance Work<br />
Maintenance Interval<br />
COLLECTOR<br />
Collector, fixing and connection visual check<br />
Check fixings and installation of supports and elements<br />
ANNUAL<br />
ANNUAL<br />
Solar Circuit<br />
Heat transfer fluid replacement<br />
Collector pump operation check (on/off)<br />
Solar fluid level check, fill where necessary<br />
MAXIMUM 3 YEARS<br />
ANNUAL<br />
ANNUAL<br />
DHW Circuit (tank)<br />
Accumulator cleaning<br />
Fitting leak-tightness check<br />
ANNUAL<br />
ANNUAL<br />
16.<br />
HEAT TRANSFER FLUID<br />
The primary circuit leaves the factory filled with the correct amount of heat transfer fluid.<br />
Manufacturer: LIV<br />
Product: FRIGOSOL 50% (propylene glycol 50%)<br />
User manual - 19