10.11.2014 Views

Manual de instalación y mantenimiento - Astral Pool

Manual de instalación y mantenimiento - Astral Pool

Manual de instalación y mantenimiento - Astral Pool

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ENGLISH<br />

Wash process:<br />

The valve automatically reverses the fi ltration cycle and commences the sand wash process, this<br />

requires that the valve is set so that the water coming from the PUMP connection passes through<br />

the valve and is taken to the fi lter by the BOTTOM connection, the sand is stirred and the water,<br />

together with any accumulated dirt exits the valve TOP connection which communicates with the<br />

WASTE connection and is taken to the drains. This process is carried out in accordance with the<br />

pre-established timing.<br />

Back-wash process:<br />

The valve is positioned to compress the fi lter bed and not to send water containing sand to the<br />

swimming pool, this is achieved by water coming from the PUMP connection entering the fi lter by<br />

the TOP connection, it then compresses the sand and the water enters the valve via the BOTTOM<br />

connection which then sends it to the WASTE connection. This process is carried out in function<br />

of the pre-established time and once it has elapsed, the valve commences the fi ltration process<br />

again.<br />

1.3 VALVE SPECIFICATIONS<br />

Sizes 1½” and 2”, si<strong>de</strong> and top mounting<br />

Valve body manufactured in ABS<br />

Internal distributor manufactured in PPO<br />

Connection via threa<strong>de</strong>d female, BSP or NPT, BOTTOM connection for gluing<br />

Maximum operating pressure 3.5 bars<br />

Test pressure 5.2 bars<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!