13.07.2015 Views

CoolAir RT880, SP950 - Waeco

CoolAir RT880, SP950 - Waeco

CoolAir RT880, SP950 - Waeco

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Installation<strong>CoolAir</strong> <strong>RT880</strong>, <strong>SP950</strong>6.2.2 Preparing the unit (<strong>RT880</strong> only)ANOTICE!During preparatory work on the surfaces, secure the unit from fallingdown.Make sure that the work surface is clean and level to ensure that the unitis not damaged.➤ Place the air conditioning roof unit on a work surface with the housingfacing down.ANOTICE!Screw in the thread insert vertically.Do not exceed the screw torque of 10 Nm.➤ Screw in the 6 self-threading M8 thread inserts in the blind holesmarked with “2” (fig. 3 1, page 4).Use the supplied 1/4" bit for this.6.2.3 Attaching the seal for the cab roofANOTICE!Ensure that the adhesive surface for the seal between the unit and thecab roof is clean (free of dust, oil, etc.).➤ Stick the 2.5 m insulating tape (10 x 20 mm) to the cab roof, followingthe outline of the sunroof opening (fig. 4, page 4).➤ Provide the abutting edge and the top edge of the insulating tape withan unhardened plastic butyl sealing compound (e.g.SikaLastomer-710).40EN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!