Section #01450 - Quality Control
Section #01450 - Quality Control
Section #01450 - Quality Control
- TAGS
- www.yumpu.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DTW Works Master Specification Version 2006Issued 2006/08/01 <strong>Section</strong> 01450 –<strong>Quality</strong> <strong>Control</strong> Page 3 of 3.2 Provide copy to Subcontractor of work being inspected or tested, manufacturer orfabricator of material being inspected or tested..3 Include copy of all inspection and test reports in Commissioning Manuals.1.9 MOCKUPS.1 Prepare mockups for Work specifically requested in specifications. Include for Work ofall <strong>Section</strong>s required to provide mockups..2 Construct in all locations acceptable to Engineer/Architect as specified in specific <strong>Section</strong>..3 Prepare mockups for Engineer's/Architect review with reasonable promptness and in anorderly sequence, so as not to cause any delay in Work..4 Failure to prepare mockups in ample time is not considered sufficient reason for anextension of Contract Time and no claim for extension by reason of such default will beallowed..5 Remove mockup at conclusion of Work or when acceptable to Engineer/Architect.6 Specification section identifies whether mockup may remain as part of Work or if it is tobe removed and when..7 Reviewed and accepted mockups will become standards of workmanship and materialagainst which installed work will be verified.1.10 EQUIPMENT AND SYSTEMS.1 Submit adjustment and balancing reports for mechanical, electrical and building equipmentsystems..2 Mechanical –coordinate with mechanical division..3 Electrical –Coordinate with electrical division.PART 2PRODUCTS (NOT APPLICABLE)PART 3EXECUTION (NOT APPLICABLE)END OF SECTION