10.07.2015 Views

Section #01450 - Quality Control

Section #01450 - Quality Control

Section #01450 - Quality Control

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DTW Works Master Specification Version 2006Issued 2006/08/01 <strong>Section</strong> 01450 –<strong>Quality</strong> <strong>Control</strong> Page 3 of 3.2 Provide copy to Subcontractor of work being inspected or tested, manufacturer orfabricator of material being inspected or tested..3 Include copy of all inspection and test reports in Commissioning Manuals.1.9 MOCK­UPS.1 Prepare mock­ups for Work specifically requested in specifications. Include for Work ofall <strong>Section</strong>s required to provide mock­ups..2 Construct in all locations acceptable to Engineer/Architect as specified in specific <strong>Section</strong>..3 Prepare mock­ups for Engineer's/Architect review with reasonable promptness and in anorderly sequence, so as not to cause any delay in Work..4 Failure to prepare mock­ups in ample time is not considered sufficient reason for anextension of Contract Time and no claim for extension by reason of such default will beallowed..5 Remove mock­up at conclusion of Work or when acceptable to Engineer/Architect.6 Specification section identifies whether mock­up may remain as part of Work or if it is tobe removed and when..7 Reviewed and accepted mock­ups will become standards of workmanship and materialagainst which installed work will be verified.1.10 EQUIPMENT AND SYSTEMS.1 Submit adjustment and balancing reports for mechanical, electrical and building equipmentsystems..2 Mechanical –coordinate with mechanical division..3 Electrical –Coordinate with electrical division.PART 2PRODUCTS (NOT APPLICABLE)PART 3EXECUTION (NOT APPLICABLE)END OF SECTION

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!