<strong>Gas</strong>skraftverket på Kårstø<br />

Kårstø Combined Cycle <strong>Power</strong> <strong>Plant</strong> (CCPP)<br />

Forelesning i faget N<strong>at</strong>urgass<br />

14.11.2007<br />

Pia Magnussen<br />

Teknisk Leder<br />

Kårstø CCPP Prosjekt<br />

PMAG@st<strong>at</strong>oilhydro.com


Innhold<br />

• Historikk – Norges første kommersielle gasskraftverk<br />

• Om kraftverket, byggingen osv.<br />

• Kraftverkets komponenter osv.<br />

• Utslipp, miljø<br />

• Oppsummering<br />

• En film og en animasjon<br />

• …. Men aller først litt om CO2 (som jeg ikke skal snakke<br />

om…..)


<strong>Gas</strong> fra NCS til Europa<br />

Til Kontinentet<br />

Til CCGT<br />

Forbruk i produksjon<br />

Sleipner<br />

Heimdal<br />

Oseberg<br />

Kollsnes<br />

Kårstø<br />

Ekofisk<br />

Ormen<br />

Basert på forventede 2008 volumer


Store enkelt CO2 kilder på fastlands Norge<br />

Tjeldbergodden<br />

Hydro polymers<br />

Norcem Brevik<br />

Noretyl<br />

Yara NH3<br />

Yara Enrgi<br />

Snøhvir<br />

Hydro Al Karmøy<br />

Kårstø<br />

Norcem Kj<br />

Mongstad<br />

Eramet<br />

Hydro Al Sunndal<br />

CCPP


Kårstø CCPP


Kårstø, Tysvær kommune i Rogaland


Historie<br />

• Melding ble sendt og konsekvensutredning igangs<strong>at</strong>t i april 1995<br />

• Konsesjonssøknad sendt februar 1996<br />

• Konsesjon gitt av NVE i oktober 1996<br />

• Påklaget av miljøorganisasjonene<br />

• Stadfestet av OED i juni 1997<br />

• Utslippssøknad sendt i desember 1997<br />

• Utslippstill<strong>at</strong>else gitt i januar 1999<br />

• Stadfestet av MD i juni 1999<br />

• N<strong>at</strong>ukraft begjærer omgjøring av utslippstill<strong>at</strong>elsene<br />

• MD omgjør utslipsstill<strong>at</strong>elsen: ”ikke strengere enn for andre EØS-land” i oktober 2000<br />

• Klage fra miljøvernorganisasjoner på utslippstill<strong>at</strong>else behandlet og avvist av OED i juli<br />

2001<br />

• Søkte og fikk forlenget konsesjoner med 3 år, 2002<br />

• Prosjektene bearbeides for å finne tilfredsstillende økonomi for eierne, 2003


22. September 2004<br />

• St<strong>at</strong>oil går ut av N<strong>at</strong>urkraft<br />

• Hydro og St<strong>at</strong>kraft vil s<strong>at</strong>se videre<br />

med gasskraftverket på Kårstø<br />

• N<strong>at</strong>urkraft får i oppdrag å legge til<br />

rette for realisering i henhold til<br />

konsesjonens frister<br />

• Planene på Kollsnes legges til side


30.06.2005<br />

N<strong>at</strong>urkraft velger Siemens<br />

som leverandør -<br />

av Norges første<br />

kommersielle gasskraftverk


Nå<br />

• St<strong>at</strong>oil og Hydro slått sammen til St<strong>at</strong>oilHydro<br />

• Kraftverket på Kårstø offisielt åpnet 1.11.2007<br />

• Prosjektet er noe forsinket, men vi håper på å være<br />

ferdig ca. 1.12.


Kontrakter inngått<br />

• Turn Key Lump Sum kontrakt for det kombinerte<br />

gasskraftverket - SIEMENS<br />

• Long Term Service Agreement for vedlikehold av<br />

gassturbin og gener<strong>at</strong>or - SIEMENS<br />

• To avtaler mot Kårstø:<br />

– Tie-in avtale fase 2 og utførelse av tie-in arbeidet<br />

– Services during construction period Agreement


Turn-key kontrakt<br />

• Bygd opp etter ”Hydrostandard”<br />

• NORSOK ikke brukt – dvs. ikke full offshorestandard<br />

• Appendix E:<br />

– Overordnet designbasis<br />

– HMS-krav<br />

– Funksjonskrav<br />

– Tekniske krav (basert på MPS og noen spec.-er)<br />

– Eget interface-dokument<br />

• Nummereringssystem KKS ikke Hydro kodemanual<br />

– (Kraftwerk-Kennzeichen-System, bransjestandard)


Kommersiell modell<br />

50 %<br />

50 %<br />

gass<br />

el<br />

50 %<br />

50 %<br />

N<strong>at</strong>urkraft eier, bygger og driver


St<strong>at</strong>nett:<br />

Kraftbalansen på lengre sikt


Kraftverket<br />

• Hovedd<strong>at</strong>a og oversikt<br />

• Kraftverket er optimalisert for maksimal kraftproduksjon<br />

• Ingen varmelevering, men lagt til rette<br />

• Vårt produkt er STRØM som leveres på nettet via<br />

St<strong>at</strong>netts linjer


Fakta om gasskraftverket<br />

• Årlig gassforbruk: Opp mot 600 mill Sm 3<br />

• Installert effekt på ca. 410 MW i gjennomsnitt over levetiden<br />

• Virkningsgrad på ca. 57 % i gjennomsnitt over levetiden<br />

• Årlig produksjon ca. 3,3 TWh<br />

• Årlig utslipp på ca. 1,2 mill tonn CO 2<br />

• Tilrettelegges for eventuell installasjon av CO 2 teknologi<br />

• SCR renseanlegg for NO x , første av sitt slag i Europa


Turbinhall og fundamenter for turbo<br />

maskineri<br />

Civil og stålstruktur – mye arbeid<br />

Store fundamenter for GT/ST/Gener<strong>at</strong>or


Innløfting av første kjel element


Vannbehandlings anlegg


Transform<strong>at</strong>or og turbinhall<br />

Transform<strong>at</strong>or<br />

fundamenter<br />

Fødevanns<br />

anlegg<br />

til kjel<br />

Turbinhall


Hovedd<strong>at</strong>a<br />

• Ca. 420 MW, (GT ca. 270 MW, ST ca. 150 MW)<br />

• Gener<strong>at</strong>or 520 MVA – Norges største (nr. 2 Svartisen)<br />

• En streng – ca. 50 m lang<br />

– Oppstartstid kald start ca. 2 timer<br />

• Brensel kapasitet: ca. 75 000 Sm3/hr, 1,8 MSm 3 /d<br />

• Kondens<strong>at</strong>or:<br />

– effektivt overfl<strong>at</strong>eareal ca. 12000 m2, vacuum pressure 21,5 mbar,<br />

design varmetransport 225000 kJ/s.<br />

• Sjøvannspumper (2x50%): ca. 14000 m3/h hver som<br />

tilsvarer ca. 30 badekar fylt pr. sek., 1250 kW motorer<br />

• Internt kraftforbruk ca. 8 MW


Vekter hovedutstyr<br />

• HRSG totalt: ca. 2 500 tonn<br />

• Gener<strong>at</strong>or: 340 tonn (egenvekt høyere enn stål)<br />

• <strong>Gas</strong>sturbin ca. 310 tonn, rotor ca. 120 tonn.<br />

• Kondens<strong>at</strong>or: 270 tonn tørrvekt, titan.<br />

• Krankapasitet: 370 tonn


Kårstø CCPP - hovedtilknytninger


Prinsipp<br />

Stack<br />

He<strong>at</strong> - Recovery<br />

Steam Gener<strong>at</strong>or<br />

<strong>Gas</strong> Turbine<br />

SSS<br />

Clutch<br />

Steam Turbine<br />

Air<br />

Electric<br />

power<br />

LP IP HP<br />

Exhaust<br />

gas<br />

GT<br />

power<br />

G<br />

~<br />

HP<br />

IP<br />

LP<br />

Fuel<br />

Auxi<br />

liary<br />

Stea<br />

m<br />

Condenser<br />

plant<br />

bypass -<br />

deaer<strong>at</strong>or<br />

Cond<br />

Prehe<strong>at</strong>er<br />

once through sea w<strong>at</strong>er<br />

cooling


Prosess skjema<br />

LP<br />

MP<br />

HP<br />

P<br />

P<br />

P<br />

Renset<br />

ferskvann<br />

Symbolforklaring<br />

= pumpe<br />

Røykgasskjel<br />

<strong>Gas</strong>sturbin Gener<strong>at</strong>or Dampturbin<br />

G<br />

Kondens<strong>at</strong>or<br />

N<strong>at</strong>urgass<br />

Luft<br />

Eventuell<br />

dampavtapping<br />

Kjølevann<br />

innløp<br />

P<br />

Kjølevann<br />

utløp<br />

P


<strong>Gas</strong>sturbind<strong>at</strong>a<br />

Massestrøm = 560 - 640 kg/s<br />

Temper<strong>at</strong>ur ut fra brennkammer = 1260 – 1400 o C<br />

Temper<strong>at</strong>ur eksos = 560 - 610 o C<br />

<strong>Gas</strong>sturbin ytelse = 250 - 267 MW<br />

Virkningsgrad = 38 %<br />

Kompresjonsforhold = 1:17


Bilder fra Berlin


Utslippskrav i kontrakt<br />

Til luft:<br />

• ≤ 2 ppmv Nox ved 15% O 2 med SCR installert<br />

• ≤ 5 ppmv NH (ammoniakk-slip)<br />

3<br />

• Krav til CO2, CO, VOC, støv<br />

Til vann:<br />

• 1,5 ppm oppløst HC målt i hht NS9803<br />

• Krav til sjøvannsmengde og ΔT<br />

• Ingen tilsetninger til kjølevann


SCR intergrert i HRSG


Selective C<strong>at</strong>alytic Reduction - SCR<br />

Inlet NO x<br />

: 15-25 ppm<br />

Outlet NO x<br />

: 2-5 ppm<br />

Outlet NH 3<br />

: 0-3 ppm


SCR prosess<br />

4NO + 4NH 3 + O 2 → 4N 2 + 6 H 2 O<br />

6 NO 2 + 8NH 3 → 7 N 2 + 12 H 2 O<br />

NOx i røykgass er mest NO og noe NO 2<br />

NO reagerer til NO 2 i <strong>at</strong>mosfæren.<br />

NOx-utslipp regnes som NO 2


SCR Flytskjema


Typiske k<strong>at</strong>alys<strong>at</strong>ortyper


Copyright (C) Siemens AG<br />

Instrumentering og kontroll<br />

Central Control Room KGP<br />

OM650<br />

Oper<strong>at</strong>or 1<br />

Central Control Room<br />

Karstoe <strong>Plant</strong><br />

OM650<br />

Oper<strong>at</strong>or 1<br />

OM650<br />

Oper<strong>at</strong>or 2<br />

Large Screen<br />

I&C Diagnostic Engineering<br />

St<strong>at</strong>ion DS670 St<strong>at</strong>ion ES680<br />

<strong>Power</strong> Diagnostic<br />

System<br />

To Office LAN<br />

(Intranet)<br />

To Dial Up network<br />

(Internet)<br />

Router<br />

Emission<br />

Monitoring System<br />

xM Server<br />

xM Server<br />

xM Server<br />

xM Server<br />

TCP/IP LAN<br />

<br />

OT<br />

Alarm and<br />

Log Printer<br />

Video<br />

Hardcopy<br />

OT<br />

Alarm and<br />

Log Printer<br />

OT<br />

Alarm and<br />

Log Printer<br />

OT<br />

Video<br />

Hardcopy<br />

Laser Printer<br />

OPC<br />

Server<br />

Remote<br />

Server<br />

Terminal Bus<br />

SU<br />

System<br />

console<br />

PU<br />

GPS<br />

Master Clock<br />

<strong>Plant</strong> Bus<br />

<strong>Gas</strong> Turbine<br />

HRSG<br />

Steam<br />

Turbine<br />

W<strong>at</strong>er / Steam<br />

and Auxiliary Systems<br />

APT<br />

APT<br />

AS620T<br />

Direct wiring<br />

PROFIBUS-DP to<br />

ET200M St<strong>at</strong>ions<br />

IEC870<br />

2xAP<br />

2xAP<br />

2xAP<br />

AS620B<br />

PROFIBUS-DP<br />

ET200M St<strong>at</strong>ions<br />

C....<br />

C.... D....<br />

C.... D.... E....<br />

D.... E.... F....<br />

E.... F....<br />

F....<br />

Fueloil<br />

2xAP<br />

AS620B<br />

2 v 2<br />

2 v 2<br />

2 v 2<br />

2 v 2<br />

Failsafe<br />

Instr.<br />

PCC<br />

Emissions<br />

Measurement<br />

Cabinet<br />

2xAP 2 v 2<br />

2xAP 2 v 2<br />

2 v 2<br />

2 v 2<br />

AS620B Failsave<br />

PROFIBUS-DP<br />

ET200M St<strong>at</strong>ions<br />

C....<br />

C.... D....<br />

C.... D.... E....<br />

D.... E.... F....<br />

E.... F....<br />

F....<br />

<br />

APT<br />

APT<br />

AS620T<br />

2xAP 2 v 2<br />

2xAP 2 v 2<br />

2xAP 2 v 2<br />

2 v 2<br />

AS620B Failsafe Instr.<br />

PROFIBUS-DP<br />

ET200M St<strong>at</strong>ions<br />

C....<br />

C.... D....<br />

C.... D.... E....<br />

D.... E.... F....<br />

E.... F....<br />

F....<br />

+ -<br />

M<br />

SOE<br />

2xAP<br />

2xAP<br />

AS620B<br />

PROFIBUS-DP<br />

ET200M St<strong>at</strong>ions<br />

C....<br />

C.... D....<br />

C.... D.... E....<br />

D.... E.... F....<br />

E.... F....<br />

F....<br />

M<br />

2xCM104<br />

2xCM104<br />

2xCM104<br />

AS620B<br />

Interface<br />

to<br />

St<strong>at</strong>kraft<br />

St<strong>at</strong>nett<br />

Hydro<br />

PCC<br />

M<br />

General:<br />

This document and the shown arrangement of<br />

autom<strong>at</strong>ion functions and I&C equipment is preliminary<br />

and not binding for execution.<br />

Legend :<br />

OM650<br />

OT<br />

HMI Server<br />

PCC<br />

PU<br />

SU<br />

OPC Server<br />

ES680<br />

AS620 B<br />

AS620 T<br />

AP<br />

APT<br />

ET200M<br />

SOE<br />

Oper<strong>at</strong>ion and monitoring system<br />

Oper<strong>at</strong>ing terminal<br />

Human Machine Interface<br />

<strong>Power</strong> control center<br />

Processing unit<br />

Archive server unit<br />

External system interface<br />

Engineering system<br />

Autom<strong>at</strong>ion system basic<br />

Autom<strong>at</strong>ion system turbine<br />

Autom<strong>at</strong>ion processor<br />

Autom<strong>at</strong>ion processor turbine<br />

Remote I/O st<strong>at</strong>ions<br />

Sequence of event<br />

REV<br />

REMARKS DATE NAME<br />

D<strong>at</strong>e<br />

Design<br />

20. Jun. 2005<br />

Kaelker<br />

Combined Cycle <strong>Power</strong> <strong>Plant</strong><br />

SCC5-4000F Single Shaft<br />

SIEMENS<br />

I&C System Configur<strong>at</strong>ion<br />

YUH =<br />

Section 11.01.01<br />

+<br />

Sheet<br />

1<br />

Sheets


Eksempel på skjermbilde


Forenklet enlinjeskjema<br />

KARMØY<br />

SAUDA<br />

300 kV<br />

ST<br />

22 kV<br />

6,6 kV<br />

G<br />

Starter<br />

35 MW 5 MW<br />

G<br />

Kårstø <strong>Gas</strong> <strong>Plant</strong> –<br />

<strong>Gas</strong>skraftverk


Oppsummering<br />

• Norges første kommersielle gasskraftverk ca. 420 MW<br />

• CCPP – en gassturbin og en tretrinns<br />

dampturbinprosess<br />

• Europas mest miljøvennlige pga ren gass og strenge<br />

utslippskrav<br />

• SCR – anlegg Selective C<strong>at</strong>alytic Reduction – gir ca. 2<br />

ppm NOX ut av skorsteinen<br />

• Ca 10 ppm NOX ut av gassturbinen før rensing<br />

• Ca. 1,2 Mill. tonn CO2-utslipp pr år<br />

• Ingen alvorlige ulykker under byggeperioden på 27 mnd!


Transformer area<br />

Main challenges<br />

• HSE<br />

Many Contractors <strong>at</strong> site needs detailed co-ordin<strong>at</strong>ion and follow up<br />

• Delay HRSG and LP steam turbine inner casing – critical for first fire<br />

• Sufficient use of ProcoSys – extent of tagging / timely delivery of inform<strong>at</strong>ion<br />

• Important milestones:<br />

• GT, ST and Gener<strong>at</strong>or placed December 2006<br />

• <strong>Plant</strong> ready for first fire: 28.04.2007 – det ble ca. 28.7.2007<br />

•Vi har produsert ca. 430 MW


Flytskjema – mer detaljert<br />

This document contains inform<strong>at</strong>ion th<strong>at</strong> is proprietary to Siemens AG<br />

<strong>Power</strong> Gener<strong>at</strong>ion and may not be reproduced or disclosed to any third<br />

party or other entity, in whole or in part, without the express prior written<br />

permission of Siemens AG <strong>Power</strong> Gener<strong>at</strong>ion.<br />

Composition Volume-%<br />

N2 0.6100<br />

CO2 2.2300<br />

CH4 85.5300<br />

C2H6 11.0700<br />

C3H8 0.4900<br />

nC4H10 0.0400<br />

iC4H10 0.0300<br />

<strong>Gas</strong><br />

LHV=46404.8<br />

15.0<br />

123.98 3491.7<br />

75.314 555.4<br />

120.95 3491.7<br />

75.314 554.3<br />

E<br />

29.53 3579.4<br />

86.533 554.2<br />

29.09 3579.4<br />

86.533 554.0<br />

3.99 3013.0<br />

91.566 273.6<br />

3.96 3005.0<br />

101.498 269.7<br />

L<br />

K<br />

R<br />

D<br />

D<br />

R<br />

R<br />

D<br />

D<br />

R<br />

B<br />

I<br />

0.000 M<br />

0.015 M<br />

0.157 M<br />

0.079 M<br />

0.044 M<br />

0.031 M<br />

0.157 M<br />

0.157 M<br />

0.031 M<br />

M<br />

H<br />

C<br />

31.44 3130.4<br />

69.985 357.4<br />

31.44 3136.5<br />

0.000 360.0<br />

31.78 3130.4<br />

69.985 357.7<br />

2.459 M<br />

1.967 M<br />

0.731 M<br />

3.96 2930.9<br />

9.932 233.6<br />

0.0215 2281.5<br />

101.750 0.897 x<br />

D<br />

R<br />

M<br />

1.013 PHI=60.0<br />

9.0<br />

Composition Weight-%<br />

O2 14.4005<br />

N2 73.5844<br />

Ar 1.2308<br />

H2O 4.8626<br />

CO2 5.9216<br />

D<br />

4.20 2930.9<br />

9.932 234.0<br />

3047.4 H<br />

0.121 M<br />

418.0 H<br />

0.000 M<br />

B<br />

I<br />

4.33 2930.9<br />

10.009 234.3<br />

C 54.15 624.8<br />

16.547 147.6<br />

G 135.47 636.5<br />

35.000 M<br />

L<br />

75.314 149.1<br />

126.861 M<br />

4.93 P<br />

20.61 619.8<br />

151.3 T<br />

10.009 146.9<br />

20.61 619.8<br />

146.9 T<br />

136.870 146.9<br />

136.870 M<br />

0.077 M<br />

G<br />

4.93 2747.5<br />

0.000 151.3<br />

K<br />

0.0215 2650.6<br />

0.000 80.0<br />

0.0215 2650.6<br />

0.000 80.0<br />

0.0215 78.3<br />

101.870 18.7<br />

0.0215 2650.6<br />

0.000 80.0<br />

8.0 T<br />

55.084 M<br />

0.000 M<br />

0.000 M<br />

0.000 M 0.000 M<br />

GUD® Net <strong>Plant</strong> Output = 417.8 MW<br />

GUD® Net He<strong>at</strong> R<strong>at</strong>e = 6222 kJ/kWh<br />

Working Sheet<br />

H<br />

94.6 H<br />

90.3 T<br />

75.0 T<br />

191.954 M<br />

35.000 M<br />

E<br />

25.00 81.8<br />

101.870 19.0<br />

bar<br />

kg/s<br />

kJ/kg<br />

°C (X)<br />

all pressures are absolute<br />

P..pressure..bar<br />

T..temper<strong>at</strong>ure..°C<br />

H..enthalpy..kJ/kg<br />

M..mass flow..kg/s<br />

PHI..<strong>at</strong>mospheric humidity..%<br />

He<strong>at</strong> Flow Diagram<br />

No.NOR140 -PG W711- T02 1 0002 LG<br />

Erlangen, 2005-Mar-16 TST<br />

JOB IDENTIFICATION : C:\D<strong>at</strong>a\Common\0-Proj\Karstoe\Thermodynamik\Angebot\Calcul<strong>at</strong>ions\A02c_Karstoe\A02c_Karstoe_Drum_KN2x125_KM2118.gek; Lp.029; schadt1t; 2005-Mar-16 10:37:06; V2.1.18<br />

W<strong>at</strong>er/Steam Property Functions: C++(2003-10-16)->H2O32Bit(2003-02-28)->IAPWS-IF97(2003-02-27)<br />

Kårstø CCPP<br />

SCC5-4000F Single Shaft<br />

9-100'GT-<strong>Gas</strong><br />

25.00 81.8<br />

101.870 19.0<br />

SIEMENS AG<br />

PG W711