6 Transport on truck<br />

Transport på lastbil<br />

The following paragraphs give recommended transport methods for the various machine<br />

models. All models have specifically installed eyebolts for easy and safe handling. If<br />

the eyebolts are missing then use the recommended connection points described below.<br />

6.1 Models STR with 2.44 m cylinder diameters.<br />

These models are normally dismantled at the factory into two parts plus several bulk<br />

components. These two parts can be loaded on a TIR. One TIR can transport two<br />

machines. Reassembly time is about 4 hours. Reassembly requires a crane with a<br />

hook at a 5 meter height and able to lift an approximate 2 tons weight. Tarped TIRs are<br />

recommended.<br />

6.2 Models FSN with 2.65 m cylinder diameters.<br />

These models are dismantled at the factory and shipped in two parts like diameter<br />

2.44m models. The cylinder, loaded with its axis horizontal, extends slightly out from<br />

both sides of the TIR.<br />

6.3 Models D - SSI - S with 3.0 - 3.15 - 3.85 m cylinder diameters.<br />

These models can be transported in two ways:<br />

a) in large parts<br />

If the drier is dismantled into large parts then it requires oversize width transport. In this<br />

case reassembly time is about 8 hours (2 workers for 4 hours) and the presence of a<br />

crane with hook at a 7 meter height and able to lift 5 tons. A low-bed TIR can transport<br />

2 driers.<br />

MODELL D, loaded on a truck, occupies 3 meters of width , it is an oversize width<br />

transport but not so expensive.<br />

MODELL SSI has a width of 3.15 meters, to reduce the costs of transport, 2 or 3 panels<br />

are de-assembled in order to re-enter in the width of 3 meters.2 machines can be<br />

carried on a single TIR and 6 hours per 2 people are requested for the assembly. On the<br />

other side it can be dismantled into small parts.<br />