Manual Mecmar mobiltork - Andersson & Henriksson
Manual Mecmar mobiltork - Andersson & Henriksson
Manual Mecmar mobiltork - Andersson & Henriksson
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
7 Assembly after transport<br />
7.1 Models with diameters from 3 to 4.5 meters (D - SSI - S - F )<br />
Montering efter transport<br />
Keep to the following instructions when, for transport reasons, the drier is dismantled at<br />
the factory according to point 6.3.b (into small parts) and the customer himself wants to<br />
perform reassembly.<br />
This task must be performed by personnel with knowledge of elementary mechanics.<br />
Perform unloading and assembly work on a flat yard and distant from obstacles and<br />
impediments.<br />
7.1.1 Necessary equipment<br />
The following equipment is necessary to assemble the drier:<br />
- a hoist designed to lift 5,000 Kg.<br />
- a compressor with screw tightener<br />
- a set of wrenches<br />
Connection materials (bolts and washers) are listed in the description of the various<br />
assembly phases, in the diagram and in the list that accompanies the machine.<br />
7.1.2 Assembly phases for drier MODELL S34/255T<br />
A) Refer to Fig.5. Set frame (1) so that its feet are resting on the base frame. Level<br />
the frame.<br />
B) Install base cone (2) inside the base and install side supports 1.1-1.2-1.3 and<br />
rear reinforcing composed of winch support (14). Then connect angle irons (15)<br />
between base cone and base.<br />
C) Install uprights (3 - Fig.6) marked with the letters B-C-D on their flat plates<br />
welded to the base using: No.4 M14x50 bolts, No.8 flat washers, No.4 split<br />
washers, 4 M14 nuts (bring them together without tightening them.<br />
Connect uprights (3) to base cone (2), without tightening the connections, using<br />
the following bolts: No.4 M14x30, No. 4 M14 self-locking nuts.<br />
D) Install mixer (4) on the thrust bearing placed below inner basket (5) as in Fig.7.<br />
E) Position inner basket (5-Fig. 8) after installing cone (6) inside the base cone.<br />
Fasten it to the 3 uprights B-C-D with 4 M12x40 screws, 8 flat washers, 4 split<br />
washers, 4 M12 nuts without tightening them.<br />
28