Manual Mecmar mobiltork - Andersson & Henriksson
Manual Mecmar mobiltork - Andersson & Henriksson
Manual Mecmar mobiltork - Andersson & Henriksson
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
7.2.4 Connecting the dust aspiration system<br />
Montering efter transport<br />
This system is the last part of the plant to be installed.<br />
The assembly procedure is illustrated on Page "5". Parts are specified as follows:<br />
13) No. 4 dia. 150 tube clips<br />
14) No. 2 tubes, dia. 150, length 450<br />
14a) Y reducer diameter 150/150/200<br />
15) No. 1 flexible tube diameter 200, l = 6 m<br />
16) No. 2 support rings, dia. 230<br />
17) No. 3 bands for dia. 200 tubes<br />
18) No. 1 90°elbow dia. 200<br />
19) No. 3 collars dia. 200<br />
20) No. 1 aspirator<br />
21) No. 1 aspirator motor<br />
22) No. 1 tube dia. 200<br />
23) No. 1 tube dia. 200, l = 100<br />
24) No. 1 flexible tube, dia. 200, l = 3 m.<br />
The electric fan is fastened to the top part of the boiler where anchor brackets are<br />
already provided. The tube that the electric fan supply cable passes through must be<br />
fastened to the bolts provided on the side of electric board "E" and "F". Then<br />
connect pin "G" to the switched outlet that comes from the alternator.<br />
44