18.09.2013 Views

Manual Mecmar mobiltork - Andersson & Henriksson

Manual Mecmar mobiltork - Andersson & Henriksson

Manual Mecmar mobiltork - Andersson & Henriksson

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7.2.4 Connecting the dust aspiration system<br />

Montering efter transport<br />

This system is the last part of the plant to be installed.<br />

The assembly procedure is illustrated on Page "5". Parts are specified as follows:<br />

13) No. 4 dia. 150 tube clips<br />

14) No. 2 tubes, dia. 150, length 450<br />

14a) Y reducer diameter 150/150/200<br />

15) No. 1 flexible tube diameter 200, l = 6 m<br />

16) No. 2 support rings, dia. 230<br />

17) No. 3 bands for dia. 200 tubes<br />

18) No. 1 90°elbow dia. 200<br />

19) No. 3 collars dia. 200<br />

20) No. 1 aspirator<br />

21) No. 1 aspirator motor<br />

22) No. 1 tube dia. 200<br />

23) No. 1 tube dia. 200, l = 100<br />

24) No. 1 flexible tube, dia. 200, l = 3 m.<br />

The electric fan is fastened to the top part of the boiler where anchor brackets are<br />

already provided. The tube that the electric fan supply cable passes through must be<br />

fastened to the bolts provided on the side of electric board "E" and "F". Then<br />

connect pin "G" to the switched outlet that comes from the alternator.<br />

44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!