Montering efter transport<br />

7.2.3 Assembly phases<br />

A Position the body of the heat generator in the front part of the cylinder and combine<br />

the parts marked with the same numbers as indicated on Page 3.<br />

The operation indicated by the number "1" must be performed by the worker<br />

from inside the drier, entering through the tapered door “3” situated on the base<br />

come (lower part of the drier) and trough the flanged tube. Fasten the front part of<br />

the heat generator using 16 M10x30 bolts, 16 split washers and 16 M10 nuts.<br />

B Replace the refill plug on the inner reduction unit that drives the scraper with a plug<br />

equipped with a relief valve. This plug prevents oil from exiting from the reduction<br />

unit when it heats up. It was necessary when the drier was horizontal for transport<br />

purposes.<br />

C For the operation indicated by the number "2" use No. 10 M12x30 bolts and No. 8<br />

dia. 12 split washers.<br />

D Insert air temperature monitoring and control probe "A" in the tube that goes inside<br />

the internal heat diffusion basket and make sure it is properly inserted, that it will not<br />

be damaged and that it juts out inside the chamber.<br />

E Insert product temperature probe "B" in the plate fastened to the screen. VARNING:<br />

a twin-taper device is used to fasten this probe and only needs to be very lightly<br />

tightened. Too much tightness could damage the heat-sensitive element inside the<br />

sensor. Check that the guard that protects the top part of the probe against falling<br />

products is installed.<br />

F Install the front support foot simultaneous with the drawbar using No. 8 M14x50<br />

bolts and relative split washers.<br />

G Connect folding discharge tube "6" to fixed tube "6" through the already-assembled<br />

pin on Page "4".<br />

H Connect cable "D" to ring "7" placed on the short rod and run it through ring "8" on<br />

the long rod and then inside tube "9" placed on the profiled ring until it reaches winch<br />

"10" where it is connected using a preinstalled clamp. Comply with the following<br />

schema for fastening the cable.<br />

I Connect hopper "11" to the fixed loading tube through pin "12", Page "5".<br />

Connect the cardan shafts:<br />

"H" to the recycle screw<br />

"I" to the loading screw.<br />